10.02.2013 Views

Regulatory oversight of nuclear safety in Finland. Annual ... - STUK

Regulatory oversight of nuclear safety in Finland. Annual ... - STUK

Regulatory oversight of nuclear safety in Finland. Annual ... - STUK

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4.2 OlkiluOtO NPP uNits 1 aNd 2<br />

Operation and operational events<br />

No events lead<strong>in</strong>g to a reactor trip occurred at<br />

the Olkiluoto <strong>nuclear</strong> power plant. In addition to<br />

the annual ma<strong>in</strong>tenance outages, TVO shut plant<br />

units down for repairs to a so-called ma<strong>in</strong>tenance<br />

outage on three occasions: damaged <strong>in</strong>ner parts <strong>in</strong><br />

the valves <strong>of</strong> the systems required for overpressure<br />

protection <strong>of</strong> and residual heat removal from the<br />

primary circuit were replaced at both plant units,<br />

and the motor <strong>of</strong> one reactor coolant pump was replaced<br />

at Olkiluoto 1 due to a bear<strong>in</strong>g fault. Other<br />

significant events <strong>in</strong>cluded faults <strong>in</strong> the diesel generators<br />

form<strong>in</strong>g part <strong>of</strong> the emergency power systems.<br />

The events are described <strong>in</strong> Appendix 3.<br />

<strong>STUK</strong> oversaw the operation on a daily basis<br />

at the plant site, by <strong>in</strong>spect<strong>in</strong>g the regular reports<br />

on operat<strong>in</strong>g activities as well as the event<br />

reports, and by mak<strong>in</strong>g two <strong>in</strong>spections as part<br />

<strong>of</strong> the periodic <strong>in</strong>spection programme. One <strong>of</strong> the<br />

most significant observations regard<strong>in</strong>g operation<br />

was to do with the activities <strong>of</strong> operat<strong>in</strong>g personnel<br />

dur<strong>in</strong>g the annual ma<strong>in</strong>tenance outages. There<br />

have been several events <strong>in</strong> recent years where the<br />

operators have reacted slowly to the alarms com<strong>in</strong>g<br />

to the control room dur<strong>in</strong>g annual ma<strong>in</strong>tenance<br />

outages. Similarly, there have been several events<br />

related to component isolation dur<strong>in</strong>g the annual<br />

ma<strong>in</strong>tenance outages. TVO has identified the <strong>in</strong>dividual<br />

events, analysed them and determ<strong>in</strong>ed the<br />

corrective actions. The events have, for example,<br />

resulted <strong>in</strong> the pumps <strong>in</strong> <strong>safety</strong> systems start<strong>in</strong>g<br />

unnecessarily as well as <strong>in</strong> radioactive systems<br />

be<strong>in</strong>g released <strong>in</strong>side the plant. Due to the recurr<strong>in</strong>g<br />

nature and common features <strong>of</strong> these events,<br />

MW<br />

1000<br />

900<br />

800<br />

700<br />

600<br />

500<br />

400<br />

300<br />

200<br />

100<br />

Olkiluoto 1, 2011<br />

0<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

100<br />

0<br />

1<br />

Figure 12. Daily average gross power <strong>of</strong> the Olkiluoto plant <strong>in</strong> 2011.<br />

900<br />

800<br />

700<br />

600<br />

500<br />

400<br />

300<br />

200<br />

<strong>STUK</strong>-B 147<br />

<strong>STUK</strong> required TVO to analyse the events as one<br />

entity and determ<strong>in</strong>e the corrective actions and<br />

report the results to <strong>STUK</strong> <strong>in</strong> a root cause report<br />

and dur<strong>in</strong>g an <strong>in</strong>spection to be conducted <strong>in</strong> the<br />

spr<strong>in</strong>g 2012.<br />

8<br />

7<br />

6<br />

5<br />

4<br />

3<br />

2<br />

1<br />

0<br />

%<br />

100<br />

90<br />

80<br />

70<br />

60<br />

50<br />

40<br />

30<br />

20<br />

10<br />

0<br />

2002 2003 2004 2005 2006 2007 2008 2009 2010 2011<br />

INES 1<br />

2002 2003 2004 2005 2006 2007 2008 2009 2010 2011<br />

Olkiluoto 1 Olkiluoto 2<br />

Olkiluoto<br />

Figure 10. INES classified events at the Olkiluoto plant<br />

(INES Level 1 or higher).<br />

Figure 11. Load factors <strong>of</strong> the Olkiluoto plant units.<br />

MW Olkiluoto 2, 2011<br />

1000<br />

2 3 4 5 6 7 8 9 10 11 12<br />

47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!