08.12.2012 Views

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3. SELECTING THE LOCATION FOR THE INDOOR UNIT<br />

3-1. Required Minimum Space for Installation and Service.<br />

Provide a check port on the piping side ceiling for repair and maintenance.<br />

Install the indoor unit once the following conditions are satisfied and after receiving the customer approval.<br />

1. The indoor unit must be within a maintenance space.<br />

2. The indoor unit must be free from any obstacles in path of the air inlet and outlet, and must allow spreading of air<br />

throughout the room.<br />

Top view<br />

(Unit:mm) Inspection hole<br />

(600 x 600)<br />

600<br />

<br />

1000<br />

600<br />

Control box<br />

Front view<br />

If the height from the floor to ceiling exceeds three meters, air flow distribution deteriorates and the effect is<br />

decreased.<br />

POSITION OF SUPENSION BOLT Apply a joint-canvas between the unit and duct to absorb unnecessary<br />

vibration.<br />

A<br />

Install the unit leaning to a drainage hole side as a figure for easy water<br />

B<br />

drainage.<br />

D<br />

C<br />

E<br />

(Unit:mm)<br />

TYPE<br />

S-36PN1E5<br />

A B C D E<br />

S-45PN1E5<br />

S-50PN1E5<br />

840 780 523 64 650<br />

S-60PN1E5<br />

S-71PN1E5<br />

S-100PN1E5<br />

1060 1000 523 64 650<br />

S-125PN1E5<br />

S-140PN1E5<br />

1260 1200 523 64 650<br />

7<br />

Above 250cm<br />

Absorber<br />

1~3mm<br />

Drainage hole<br />

Caution<br />

Remove the absorber at air return<br />

hole before installation.<br />

Fig.3-1<br />

Fig.3-1.1<br />

ENGLISH<br />

��������� E������� PORTUGUÊS<br />

�������<br />

����������

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!