Utilities (natural gas, electricity, steam and wastewater<br />
treatment) are more difficult to bring in-house. In 2002<br />
arrangements were made to begin to purchase natural gas<br />
directly from a broker. A new meter had to be installed and<br />
the old service disconnected from SCI. This allowed Zeochem<br />
to directly control the cost of the natural gas used and to even<br />
out the financial impact. This program has been successful<br />
in controlling and predicting costs.<br />
In 2007 an opportunity developed for Zeochem to achieve significant<br />
cost reduction by treating its own wastewater. An<br />
investment proposal was approved by the <strong>CPH</strong> Board of<br />
Directors. Because the addition of a wastewater treatment<br />
system will add more electrical demand than the current<br />
electrical system can handle, a new electrical supply was<br />
required. The new electrical system was designed to be independent<br />
and to replace the historic supply through SCI.<br />
Work began on the wastewater treatment system and new<br />
electrical system in January of 2008. The new electrical system<br />
will go live on 15 April. The wastewater treatment system<br />
will be on line in early July 2008.<br />
With the startup of the new electrical service and wastewater<br />
treatment service, the only remaining utility tied to SCI is<br />
the steam supply. A new boiler and steam distribution system<br />
are actively being considered. An investment proposal<br />
is anticipated in the next one to two years. At that point<br />
Zeochem L.L.C. will truly have utility freedom.<br />
Zeochem, L.L.C.<br />
Michael E. George<br />
New electrical switchgear<br />
New wastewater treatment foundations<br />
New electrical transformer