26.02.2013 Views

Dóra Fazekas Carbon Market Implications for new EU - UniCredit ...

Dóra Fazekas Carbon Market Implications for new EU - UniCredit ...

Dóra Fazekas Carbon Market Implications for new EU - UniCredit ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2007, three installations joined the system. The interviews conducted <strong>for</strong> this dissertation revealed<br />

that – in several instances at least – the requested allowances appeared on the <strong>new</strong> entrant<br />

installation’s accounts only after April 30, 2008, by which time the installation had surrendered the<br />

allowances according to its emissions, and by which time, too, its allowances had become worthless<br />

anyway.<br />

Analysis of the Allocation Plan revealed that there were twenty installations, which were not<br />

allocated allowances initially. It was hypothesized by the author, in connection with these<br />

installations, that they were <strong>new</strong> entrants to the scheme, beginning carbon-dioxide-emitting<br />

activities only after January 2005. As this dissertation was being prepared, officials of the Ministry<br />

of Environment and Water provided the list of <strong>new</strong> entrants <strong>for</strong> the years 2006 and 2007: thirteen of<br />

these twenty installations were on the list, but only five of them received allocations <strong>for</strong> free<br />

(italicized in the table below), all of them representing the energy sector. As far as the year 2007 is<br />

concerned, when all pilot phase <strong>new</strong> entrants had already begun their operations, only 16.5% had<br />

received allocations <strong>for</strong> free. It is interesting to note that of the five installations, two received<br />

allocations that were more than enough to cover their emissions, while three ended up facing a<br />

shortage.<br />

2005 2006 2007<br />

Installation Alloc. Emiss. Alloc. Emiss. Alloc. Emiss.<br />

Miskolc Hold utcai Kombinált Ciklusú<br />

Er"m! 0 0 0 0 23,04 21,968<br />

DCCE gázmotoros kiser"m! 0 0 22,131 24,757 22,131 26,17<br />

Hankook Tire Magyarország Kft.<br />

Gumiabroncs gyár 0 0 0 0 4,133 5,789<br />

Almex96 Kft 0 0 3,934 3,891 3,934 3,404<br />

Inotal Kft. 0 0 0 0 2,512 7,514<br />

NYKCE Nyíregyházi Kombinált<br />

Ciklusú Er"m! Kft. 0 0 0 0 0 85,807<br />

Újpalotai Gázmotoros Er"m! 0 30,235 0 59,386 0 61,578<br />

Füredi úti Gázmotoros Blokkf!t"er"m! 0 29,806 0 53,806 0 52,459<br />

Bakony úti F!t"er"m! Er"m! Fejleszt"<br />

Kft 0 0 0 0 0 27,159<br />

Wienerberger, Tiszavasvári Téglagyár 0 6,128 0 15,021 0 21,833<br />

MOL Nyrt. 0 0 0 0 0 10,485<br />

Creaton Hungary Kft. 0 3,877 0 5,636 0 5,48<br />

Gázmotoros F!t"er"m! 0 0 0 0 0 3,247<br />

Dunakeszi Aszfaltkever" üzem 0 3,253 0 3,969 0 2,838<br />

Verebély úti Gázmotoros F!t"er"m!<br />

Energott Kft 0 0 0 0 0 2,202<br />

MVM Észak-Buda Gázturbinás<br />

Kogenerációs F!t"er"m! 0 0 0 0 0 0<br />

94

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!