3. Take sufficient time to check all the components and connectors associated with the circuit boards. With<br />

the power off, push on them gently to make sure that they are seated in their sockets. Look for any cables<br />

that have become disconnected, look for any signs of damage and loose parts in the bottom of the panel box.<br />

If there are any signs that the machine was mishandled, call the factory before proceeding.<br />

<strong>installation</strong> oF pendant (vs seRies only)<br />

CAUTION! Use proper lifting equipment and techniques when performing the following<br />

steps.<br />

1. Unpack and remove the pendant from its shipping crate. Remove the small retaining plate bolted to the<br />

bottom of the pivot of the pendant.<br />

2. Position the pendant so that the pivot point is near the pendant pivot block already bolted to the table<br />

casting. Ensure the pendant wiring is moved out of the way and will not interfere in fitting the pendant pivot to<br />

the pendant pivot block.<br />

3. Insert the pendant pivot into the pendant pivot block. Secure the pendant using the plate and hardware<br />

removed in Step 1.<br />

NOTE: When inserting the pendant pivot into the pendant pivot block, make sure the pendant<br />

arm is perpendicular to the table, as shown in the figure.<br />

Pivot Block<br />

Top Cover<br />

Pendant Pivot Block<br />

Table Cable Trough<br />

Trough Extension<br />

w/Covers<br />

Table Cable Trough<br />

4. Place the table cable trough on the floor. Arrange the pendant wiring through the pendant pivot block and<br />

into the trough. Slide the trough under the <strong>mill</strong> table.<br />

5. Move to the opposite side of the table (chip auger side). Remove the 1/4-20 BHCS from the trough cover<br />

and remove the cover. Cut the cable ties and unroll the control cabinet wiring into the trough.<br />

6. Attach trough extension to the flange of the table bed. Route the cables from the table cable trough up into<br />

the trough extension. Connect the cable ends from the pendant to the cable ends from the control cabinet.<br />

7. When the proper cable connections have been made, attach all the trough covers to the trough assembly<br />

using 1/4-20 BHCS.<br />

8. Attach the table cable trough to the table and secure with 1/4-20 BHCS.<br />

9. Move to the pendant side of the table. Attach the table cable trough to the bottom of the pendant pivot block<br />

using 1/4-20 BHCS.<br />

10. Attach the pivot block top cover to the pendant pivot block. Secure with 1/4-20 BHCS.<br />

12 Installation 96-0284A<br />

© <strong>Haas</strong> <strong>Automation</strong> June 2010