Shipping<br />
Position<br />
Operating<br />
Position<br />
After the machine is installed, the High Intensity Lighting option must be reconfigured from its shipping<br />
position. To do this, perform the following steps on the right light assembly.<br />
1. Remove the BHCS securing the cover to the light arm. Remove the cover.<br />
2. Remove the two BHCS securing High Intensity Light assembly to header bar. Loosen (not remove) center<br />
pivot screw. Remove the two BHCS from threaded holes in header bar. Rotate light assembly 180°. Line up<br />
holes in light assembly with threaded holes in header bar. Insert removed BHCS and tighten all five screws.<br />
FRONT<br />
Pivot Screw<br />
(loosen only)<br />
Remove 4screws<br />
TOP VIEW OF MACHINE<br />
(Temporary shipping configuration)<br />
FRONT<br />
3. Take up any slack in the power cables. Tighten the strain-relief nuts.<br />
Secure Bracket using<br />
these 5screws<br />
TOP VIEW OF MACHINE<br />
(Setup Complete)<br />
4. Attach High Intensity Light cover to back of the light assembly and secure with screws removed in step 1.<br />
accessoRy table<br />
The Accessory Table is wrapped and shipped in the machine.<br />
Unwrap and install the table in the provided mounting brackets on the front of the machine.<br />
42 Installation 96-0284A<br />