2. Prepare the column base for mating<br />

• Stone and clean thoroughly the mating flange surface. This is an extremely important step that must be<br />

well and properly done before the bases are moved into position with respect to each other. (Failure to<br />

properly prepare the surfaces and preserve their cleanliness may require separation of the main<br />

components for corrective action).<br />

• Check the thread of each hole in the column base, ensure there is no damage.<br />

• Ensure the air/electrical/oil lines and connectors are safely away from the mating surfaces.<br />

3. Place the table base assembly in position. Rough level by measuring from the floor to the bottom of the<br />

base (very close to 2.5 inches). Each of the leveling screws and pads should be in place at this time and it is<br />

advisable to take the measurement at each leveling screw location for best results. This will ensure that the<br />

final leveling procedure will go more quickly and that the coolant tank will properly fit beneath the coolant<br />

discharge. Loosely screw the jam nuts onto the leveling screws.<br />

6 Installation 96-0284A<br />

© <strong>Haas</strong> <strong>Automation</strong> June 2010<br />

1 2 3 4 5 6<br />

2.5" min.<br />

4. Place the column base assembly in position. When placing the column base in position with respect to the<br />

table base, it is important that the two mating flanges be as parallel as possible (vertically and horizontally).<br />

Be certain that each of the screws are actually engaged in the threads, and that when the column base is<br />

in place and the mating surfaces are in contact that each screw is free to rotate. Rough level by measuring<br />

from the floor to the bottom of the base (very close to 2.5 inches). Each of the leveling screws and pads<br />

should be in place at this time and it is advisable to take the measurement at each leveling screw location<br />

for best results. This will ensure that the final leveling procedure will go more quickly. After rough leveling,<br />

fully tighten the connecting screws to be sure the mating surfaces are in full contact, and then loosen them<br />

all approximately 3 full turns. Be certain that the connecting screws are still free to rotate (do not leave the<br />

connecting bolts tight at this time because the machine still must be final leveled and squared).<br />

Grating Platform<br />

Large vertical machines (VF-6 through 11) have a small platform located on either side of the Y-axis waycover<br />

to provide a safe support for an operator should it be necessary to enter the enclosure.<br />

The platform supports are preinstalled in domestic machines.<br />

Export machines do not have the platform supports installed to allow for lifting. The two supports and required<br />

bolts are shipped inside the machine enclosure. After the machine is set in place, install the platform supports<br />

in the countersunk holes (3 each) on either side of the Y-Axis waycover using the supplied bolts.<br />

Work Platform<br />

Large vertical machines (VF-6 through 11) have a moveable work platform that can be placed in front of<br />

the machine for operator access. The platform is wrapped and shipped attached to the pallet alongside the<br />

machine. When the machine is in place, set the work platform on its legs in front of the machine enclosure.