26.03.2013 Views

Vertical mill installation instructions - Haas Automation, Inc.

Vertical mill installation instructions - Haas Automation, Inc.

Vertical mill installation instructions - Haas Automation, Inc.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

optional auxiliaRy FilteR FoR tsc systeM<br />

Ground<br />

Line<br />

Main<br />

Circuit<br />

Breaker<br />

L1 L2 L3<br />

Installation<br />

1. Hang the auxiliary filter assembly from the coolant tank handle and secure it with two 1/4-20 screws as<br />

shown.<br />

To<br />

Spindle<br />

Head<br />

Standard<br />

Pump<br />

Gate<br />

Filter<br />

Standard Filtration Setup<br />

TSC<br />

Pump<br />

To<br />

TSC<br />

Filter<br />

From TSC<br />

Pump (1)<br />

Gate Filter<br />

To TSC<br />

Pump (2)<br />

44 Installation 96-0284A<br />

© <strong>Haas</strong> <strong>Automation</strong> June 2010<br />

1<br />

To TSC<br />

Filter<br />

2. Connect the hose attached to the spindle head to the hose connection on the Standard Coolant Pump.<br />

3. Separate the hoses coming from the Auxiliary Filter. They have been connected together for shipping.<br />

4. Attach the Auxiliary Filter male connector (top hose) to female connector on the TSC Coolant Pump Assembly<br />

(Items labeled “1” in the previous illustration).<br />

2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!