8. Electrical power must be phased properly to avoid damage to your equipment. The Power Supply<br />

Assembly PC board incorporates a “Phase Detect” circuit with neon indicators, shown below. When the<br />

orange neon is lit (NE5), the phasing is incorrect. If the green neon is lit (NE6), the phasing is correct. If both<br />

neon indicators are lit, then you have a loose wire; check the connections. Adjust phasing by swapping L1<br />

and L2 of the incoming power lines at the main circuit breaker.<br />

PHASE DETECT<br />

(FOR 3PHASE ONLY)<br />

PASS FAIL<br />

NE6<br />

WARNING!<br />

All power must be turned off at the source prior to adjusting phasing.<br />

9. Turn off the power, close the door, lock the latches, and turn the power back on.<br />

10. Remove the key from the control cabinet and give it to the shop manager.<br />

<strong>installation</strong> pRoceduRe FoR exteRnal 480v tRansFoRMeR<br />

Introduction<br />

The external transformer adds to overall machine reliability and performance; however it does require extra<br />

wiring and a place to locate it. The external transformer provides electrostatically shielded isolation. This type<br />

of transformer acts to isolate all common mode line transients and improve EMI conducted emissions.<br />

The external transformer has a 45 KVA rating. It is a 480V 60Hz only transformer.<br />

Installation<br />

The transformer should be located as close to the machine as possible. The input and output wiring of the<br />

transformer should conform to the local electrical codes and should be performed by a licensed electrician.<br />

The following is for guidance only, and should not be construed to alter the requirements of local regulations.<br />

The input wire should not be smaller than 6 AWG for the 45KVA transformer. Cable that runs longer than 100"<br />

will require at least one size larger wire. The output wire size should be 4 AWG.<br />

The transformer is 480V to 240V isolation transformers with delta-wound primary and secondary windings.<br />

The primary windings offer 7 tap positions, 2 above and 4 below the nominal input voltage of 480V.<br />

The primary side should be wired as follows:<br />

16 Installation 96-0284A<br />

© <strong>Haas</strong> <strong>Automation</strong> June 2010<br />

NE5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!