Due to the importance of exact navigation C/S Pleijel was equipped with DGPS and<br />

dynamic positioning system (DP). The accuracy of the DP is nearly 1-2 cm in normal<br />

conditions. Before every cable laying operation, the crew positions a profiler in the bow.<br />

The profiler films the trench that is displayed on the bridge. The monitor verifies the real<br />

position of the trench from which the DP can be coordinated.<br />

6.1.1 <strong>Cable</strong> path<br />

C/S Pleijel was loaded with the inter-array cables in the form of two coils at ground deck.<br />

The stern of the ground deck was equipped with a turntable. The turntable was necessary<br />

because the bridge above covered half of the coil, figure 16. The deck above the coils<br />

(shelter deck) had a hatch cover that remained open during installation.<br />

Figure 16. The stern coil was equipped with a turntable.<br />

From the cable coils the cables were pulled up through the gooseneck with a wire, see<br />

figure 17. The gooseneck is located on the shelter deck and is articulated to avoid kinks on<br />

the cable. Depending from which coil the cable was pulled the angle of the gooseneck is<br />

adjusted. It was important to ensure that the cable did not get any kinks when being pulled<br />