Due to the importance of exact navigation C/S Pleijel was equipped with DGPS and<br />
dynamic positioning system (DP). The accuracy of the DP is nearly 1-2 cm in normal<br />
conditions. Before every cable laying operation, the crew positions a profiler in the bow.<br />
The profiler films the trench that is displayed on the bridge. The monitor verifies the real<br />
position of the trench from which the DP can be coordinated.<br />
6.1.1 <strong>Cable</strong> path<br />
C/S Pleijel was loaded with the inter-array cables in the form of two coils at ground deck.<br />
The stern of the ground deck was equipped with a turntable. The turntable was necessary<br />
because the bridge above covered half of the coil, figure 16. The deck above the coils<br />
(shelter deck) had a hatch cover that remained open during installation.<br />
Figure 16. The stern coil was equipped with a turntable.<br />
From the cable coils the cables were pulled up through the gooseneck with a wire, see<br />
figure 17. The gooseneck is located on the shelter deck and is articulated to avoid kinks on<br />
the cable. Depending from which coil the cable was pulled the angle of the gooseneck is<br />
adjusted. It was important to ensure that the cable did not get any kinks when being pulled<br />
up.<br />
20 (30)