Figure 18. The linear cable engine transports the cable forward to the bow wheel.<br />

The bow wheel operator controlled the speed of the cable engine, figure 19. The bow<br />

wheel operator was positioned in the bow where he had a good overview of the cable<br />

laying.<br />

Figure 19. The bow wheel operator leads the operation at the bow wheel.<br />

22 (30)