wind turbines and electrical system. Phil/Hochtief was the main supplier of the gravity base<br />

structure platforms, which will not be addressed in this report.<br />

2.2 <strong>Cable</strong> installation organisation<br />

The wind turbines were purchased from Siemens Wind Power, and the contract included<br />

high voltage cables in the form of internal grid cables and export cable. The high-voltage<br />

cables were supplied by ABB High Voltage <strong>Cable</strong>s. ABB also used subcontractors for the<br />

installation work, see figure 2.<br />

Constructor:<br />

Main contractors:<br />

Subcontractors:<br />

Seløy<br />

Undervannsservice A/S<br />

Export cable<br />

installation work<br />

Figure 2. Schedule over the contractors<br />

Due to the importance of the submarine cables and the complexity of the installation<br />

<strong>Vattenfall</strong> AB had on-site supervision.<br />

2.3 <strong>Lillgrund</strong> cable system<br />

Siemens Windpower<br />

ABB High Voltage <strong>Cable</strong>s<br />

Svensk<br />

Sjöentreprenad AB<br />

(SSE)<br />

Diving and<br />

transports etc.<br />

The offshore wind farm electrical network includes a series of inter-array cables and an<br />

export cable, see figure 3.<br />

6 (30)<br />

<strong>Vattenfall</strong> AB<br />

Peter Madsen<br />

Rederi A/S<br />

Phil/Hochtief<br />

Baltic <strong>Offshore</strong> AB<br />

Transports etc. Inter array cable<br />

installation work