Core removal from the reactor building: Dismantling begins 18 m above ground and ends 20 m below ground<br />

Sawing of the dome segment with a concrete saw<br />

Heavy-walled steel parts are cut with a band saw Decontamination using steel-grit blasting<br />

for a targeted surface abrasion<br />

SIEMPELKAMP | NUCLEAR TECHNOLOGY<br />

After the dismantling of the plant components, the tasks necessary<br />

for the release of the building structures began.<br />

For this last and important phase which resulted in the release of<br />

the building and plant premises, the <strong>NIS</strong> engineers developed a<br />

concept for the internal clearance measurements and coordinated<br />

the approach with the authority and surveyors.<br />

The radiation measurements necessary for the clearance of the<br />

building and premises were carried out between 2007 and the<br />

beginning of <strong>2010</strong>. At the same time an authorized expert<br />

assigned by the nuclear regulatory authority carried out control<br />

measurements.