sr 60 “twin pairs” - City of Vero Beach
sr 60 “twin pairs” - City of Vero Beach
sr 60 “twin pairs” - City of Vero Beach
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
SUMMARY AND NEXT STEPS<br />
The <strong>City</strong> <strong>of</strong> <strong>Vero</strong> <strong>Beach</strong> requested that the Indian River County MPO conduct a traffic calming feasibility<br />
study to develop measures to mitigate the adverse impacts <strong>of</strong> the SR <strong>60</strong> “Twin Pairs” on pedestrian-<br />
oriented mixed-use development in Downtown <strong>Vero</strong> <strong>Beach</strong>. This study evaluated the feasibility <strong>of</strong><br />
reducing eastbound travel lanes from three to two and westbound travel lanes from four to two between<br />
20 th Avenue and FEC railroad.<br />
As demonstrated in this report, the existing and forecast traffic volumes on the roadway network support<br />
the proposed lane reduction. Further, a qualitative assessment shows that the proposed lane reduction is<br />
not expected to have an adverse impact on evacuations. The draft concept plans and traffic analysis<br />
were submitted to the FDOT for review and comment. The study results were presented at a public<br />
workshop on November 15, 2012, and to the <strong>City</strong> <strong>of</strong> <strong>Vero</strong> <strong>Beach</strong>’s Planning and Zoning Board on<br />
December 20, 2012. Further, the proposed concepts will be presented to the following committees:<br />
Technical Advisory Committee and Citizens Advisory Committee - Indian River County MPO<br />
Governing Board - Indian River County MPO<br />
<strong>City</strong> <strong>of</strong> <strong>Vero</strong> <strong>Beach</strong> Council<br />
If the proposed lane reduction concept is approved by these stakeholders, the project sponsor will be<br />
required to submit a formal Lane Elimination Request to FDOT District Four. Further coordination will be<br />
required for identifying potential funding sources for project implementation.<br />
SR <strong>60</strong> “Twin Pairs” Traffic Calming Feasibility Study Page 25