13.07.2013 Views

sr 60 “twin pairs” - City of Vero Beach

sr 60 “twin pairs” - City of Vero Beach

sr 60 “twin pairs” - City of Vero Beach

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

HCM Signalized Intersection Capacity Analysis<br />

4: 20 Avenue NB & SR <strong>60</strong> WB<br />

11/13/2012<br />

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR<br />

Lane Configurations<br />

Volume (vph) 0 0 0 0 1059 49 65 109 0 0 0 0<br />

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900<br />

Total Lost time (s) 3.8 3.8 4.0<br />

Lane Util. Factor 0.91 1.00 0.95<br />

Frt 1.00 0.85 1.00<br />

Flt Protected 1.00 1.00 0.98<br />

Satd. Flow (prot) 4577 1425 3134<br />

Flt Permitted 1.00 1.00 0.98<br />

Satd. Flow (perm) 4577 1425 3134<br />

Peak-hour factor, PHF 1.00 1.00 1.00 1.00 0.73 0.76 0.85 0.71 1.00 1.00 1.00 1.00<br />

Adj. Flow (vph) 0 0 0 0 1451 64 76 154 0 0 0 0<br />

RTOR Reduction (vph) 0 0 0 0 0 31 0 54 0 0 0 0<br />

Lane Group Flow (vph) 0 0 0 0 1451 33 0 176 0 0 0 0<br />

Turn Type NA Perm Split NA<br />

Protected Phases 6 8 8<br />

Permitted Phases 6<br />

Actuated Green, G (s) 61.0 61.0 28.2<br />

Effective Green, g (s) 62.5 62.5 29.2<br />

Actuated g/C Ratio 0.52 0.52 0.24<br />

Clearance Time (s) 5.3 5.3 5.0<br />

Vehicle Extension (s) 3.0 3.0 3.0<br />

Lane Grp Cap (vph) 2383 742 762<br />

v/s Ratio Prot c0.32 c0.06<br />

v/s Ratio Perm 0.02<br />

v/c Ratio 0.61 0.04 0.23<br />

Uniform Delay, d1 20.2 14.1 36.4<br />

Progression Factor 1.13 1.83 0.04<br />

Incremental Delay, d2 0.8 0.1 0.2<br />

Delay (s) 23.7 25.9 1.8<br />

Level <strong>of</strong> Service C C A<br />

Approach Delay (s) 0.0 23.8 1.8 0.0<br />

Approach LOS A C A A<br />

Intersection Summary<br />

HCM 2000 Control Delay 20.9 HCM 2000 Level <strong>of</strong> Service C<br />

HCM 2000 Volume to Capacity ratio 0.43<br />

Actuated Cycle Length (s) 120.0 Sum <strong>of</strong> lost time (s) 15.8<br />

Intersection Capacity Utilization 34.8% ICU Level <strong>of</strong> Service A<br />

Analysis Period (min) 15<br />

c Critical Lane Group<br />

PM Peak 5:00 pm 11/7/2012 2035 build conditions Synchro 7 - Report<br />

Page 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!