13.07.2013 Views

sr 60 “twin pairs” - City of Vero Beach

sr 60 “twin pairs” - City of Vero Beach

sr 60 “twin pairs” - City of Vero Beach

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

HCM Signalized Intersection Capacity Analysis<br />

1: 20 Avenue SB & SR <strong>60</strong> EB<br />

11/13/2012<br />

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR<br />

Lane Configurations<br />

Volume (vph) 0 792 68 0 0 0 0 0 0 28 170 0<br />

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900<br />

Lane Width 12 11 12 12 12 12 12 12 12 12 12 12<br />

Total Lost time (s) 4.3 4.0<br />

Lane Util. Factor 0.91 0.95<br />

Frt 0.99 1.00<br />

Flt Protected 1.00 0.99<br />

Satd. Flow (prot) 4374 3168<br />

Flt Permitted 1.00 0.99<br />

Satd. Flow (perm) 4374 3168<br />

Peak-hour factor, PHF 1.00 0.71 0.75 1.00 1.00 1.00 1.00 1.00 1.00 0.75 0.58 1.00<br />

Adj. Flow (vph) 0 1115 91 0 0 0 0 0 0 37 293 0<br />

RTOR Reduction (vph) 0 7 0 0 0 0 0 0 0 0 59 0<br />

Lane Group Flow (vph) 0 1199 0 0 0 0 0 0 0 0 271 0<br />

Turn Type NA Split NA<br />

Protected Phases 2 3 3<br />

Permitted Phases<br />

Actuated Green, G (s) 58.0 19.3<br />

Effective Green, g (s) 59.0 20.3<br />

Actuated g/C Ratio 0.49 0.17<br />

Clearance Time (s) 5.3 5.0<br />

Vehicle Extension (s) 3.0 3.0<br />

Lane Grp Cap (vph) 2150 535<br />

v/s Ratio Prot c0.27 c0.09<br />

v/s Ratio Perm<br />

v/c Ratio 0.56 0.51<br />

Uniform Delay, d1 21.4 45.3<br />

Progression Factor 1.00 0.14<br />

Incremental Delay, d2 1.0 0.7<br />

Delay (s) 22.4 7.1<br />

Level <strong>of</strong> Service C A<br />

Approach Delay (s) 22.4 0.0 0.0 7.1<br />

Approach LOS C A A A<br />

Intersection Summary<br />

HCM 2000 Control Delay 19.1 HCM 2000 Level <strong>of</strong> Service B<br />

HCM 2000 Volume to Capacity ratio 0.40<br />

Actuated Cycle Length (s) 120.0 Sum <strong>of</strong> lost time (s) 14.8<br />

Intersection Capacity Utilization 31.8% ICU Level <strong>of</strong> Service A<br />

Analysis Period (min) 15<br />

c Critical Lane Group<br />

PM Peak 5:00 pm 11/7/2012 2035 no-build conditions Synchro 8 Report<br />

Page 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!