13.07.2013 Views

sr 60 “twin pairs” - City of Vero Beach

sr 60 “twin pairs” - City of Vero Beach

sr 60 “twin pairs” - City of Vero Beach

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

HCM Signalized Intersection Capacity Analysis<br />

3: 20 Avenue SB & SR <strong>60</strong> WB<br />

11/13/2012<br />

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR<br />

Lane Configurations<br />

Volume (vph) 0 0 0 44 1126 0 0 0 0 0 150 65<br />

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900<br />

Total Lost time (s) 4.0 3.0<br />

Lane Util. Factor 0.91 0.95<br />

Frt 1.00 0.96<br />

Flt Protected 1.00 1.00<br />

Satd. Flow (prot) 4568 3069<br />

Flt Permitted 1.00 1.00<br />

Satd. Flow (perm) 4568 3069<br />

Peak-hour factor, PHF 1.00 1.00 1.00 0.71 0.74 1.00 1.00 1.00 1.00 1.00 0.58 0.78<br />

Adj. Flow (vph) 0 0 0 62 1522 0 0 0 0 0 259 83<br />

RTOR Reduction (vph) 0 0 0 0 5 0 0 0 0 0 29 0<br />

Lane Group Flow (vph) 0 0 0 0 1579 0 0 0 0 0 313 0<br />

Turn Type Prot NA NA<br />

Protected Phases 4! 4 6! 7!<br />

Permitted Phases<br />

Actuated Green, G (s) 84.9 17.4<br />

Effective Green, g (s) 87.9 18.4<br />

Actuated g/C Ratio 0.73 0.15<br />

Clearance Time (s) 4.0<br />

Vehicle Extension (s) 3.0<br />

Lane Grp Cap (vph) 3498 470<br />

v/s Ratio Prot c0.11 c0.10<br />

v/s Ratio Perm 0.24<br />

v/c Ratio 0.45 0.67<br />

Uniform Delay, d1 6.4 47.9<br />

Progression Factor 2.86 1.00<br />

Incremental Delay, d2 0.1 3.6<br />

Delay (s) 18.4 51.5<br />

Level <strong>of</strong> Service B D<br />

Approach Delay (s) 0.0 18.4 0.0 51.5<br />

Approach LOS A B A D<br />

Intersection Summary<br />

HCM 2000 Control Delay 24.3 HCM 2000 Level <strong>of</strong> Service C<br />

HCM 2000 Volume to Capacity ratio 0.51<br />

Actuated Cycle Length (s) 120.0 Sum <strong>of</strong> lost time (s) 14.3<br />

Intersection Capacity Utilization 38.7% ICU Level <strong>of</strong> Service A<br />

Analysis Period (min) 15<br />

! Phase conflict between lane groups.<br />

c Critical Lane Group<br />

PM Peak 5:00 pm 11/7/2012 2035 no-build conditions Synchro 8 Report<br />

Page 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!