sr 60 “twin pairs” - City of Vero Beach
sr 60 “twin pairs” - City of Vero Beach
sr 60 “twin pairs” - City of Vero Beach
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
HCM Signalized Intersection Capacity Analysis<br />
2: 20 Avenue NB & SR <strong>60</strong> EB<br />
11/13/2012<br />
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR<br />
Lane Configurations<br />
Volume (vph) 8 809 0 0 0 0 0 170 52 0 0 0<br />
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900<br />
Lane Width 12 11 12 12 12 12 12 12 12 12 12 12<br />
Total Lost time (s) 4.3 4.3 4.5<br />
Lane Util. Factor 1.00 0.91 0.95<br />
Frt 1.00 1.00 0.97<br />
Flt Protected 0.95 1.00 1.00<br />
Satd. Flow (prot) 1593 4424 3078<br />
Flt Permitted 0.95 1.00 1.00<br />
Satd. Flow (perm) 1593 4424 3078<br />
Peak-hour factor, PHF 0.58 0.84 1.00 1.00 1.00 1.00 1.00 0.71 0.75 1.00 1.00 1.00<br />
Adj. Flow (vph) 14 963 0 0 0 0 0 239 69 0 0 0<br />
RTOR Reduction (vph) 4 0 0 0 0 0 0 22 0 0 0 0<br />
Lane Group Flow (vph) 10 963 0 0 0 0 0 286 0 0 0 0<br />
Turn Type Split NA NA<br />
Protected Phases 2 3 2 3 4<br />
Permitted Phases<br />
Actuated Green, G (s) 82.6 82.6 26.9<br />
Effective Green, g (s) 83.6 83.6 27.9<br />
Actuated g/C Ratio 0.70 0.70 0.23<br />
Clearance Time (s) 5.5<br />
Vehicle Extension (s) 3.0<br />
Lane Grp Cap (vph) 1109 3082 715<br />
v/s Ratio Prot 0.01 c0.22 c0.09<br />
v/s Ratio Perm<br />
v/c Ratio 0.01 0.31 0.40<br />
Uniform Delay, d1 5.6 7.1 39.0<br />
Progression Factor 0.00 0.01 1.00<br />
Incremental Delay, d2 0.0 0.0 0.4<br />
Delay (s) 0.0 0.2 39.3<br />
Level <strong>of</strong> Service A A D<br />
Approach Delay (s) 0.1 0.0 39.3 0.0<br />
Approach LOS A A D A<br />
Intersection Summary<br />
HCM 2000 Control Delay 9.5 HCM 2000 Level <strong>of</strong> Service A<br />
HCM 2000 Volume to Capacity ratio 0.35<br />
Actuated Cycle Length (s) 120.0 Sum <strong>of</strong> lost time (s) 14.3<br />
Intersection Capacity Utilization 55.2% ICU Level <strong>of</strong> Service B<br />
Analysis Period (min) 15<br />
c Critical Lane Group<br />
PM Peak 5:00 pm 11/7/2012 2035 no-build conditions Synchro 8 Report<br />
Page 2