13.07.2013 Views

sr 60 “twin pairs” - City of Vero Beach

sr 60 “twin pairs” - City of Vero Beach

sr 60 “twin pairs” - City of Vero Beach

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

HCM Signalized Intersection Capacity Analysis<br />

5: 14 Avenue & SR <strong>60</strong> EB<br />

11/13/2012<br />

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR<br />

Lane Configurations<br />

Volume (vph) 52 634 47 0 0 0 0 202 42 49 306 0<br />

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900<br />

Lane Width 12 11 12 12 12 12 12 12 12 12 12 12<br />

Total Lost time (s) 4.2 4.1 4.1 3.6 4.1<br />

Lane Util. Factor 0.95 1.00 1.00 1.00 1.00<br />

Frpb, ped/bikes 1.00 1.00 0.98 1.00 1.00<br />

Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00<br />

Frt 0.99 1.00 0.85 1.00 1.00<br />

Flt Protected 1.00 1.00 1.00 0.95 1.00<br />

Satd. Flow (prot) 3021 1676 1391 1589 1676<br />

Flt Permitted 1.00 1.00 1.00 0.39 1.00<br />

Satd. Flow (perm) 3021 1676 1391 651 1676<br />

Peak-hour factor, PHF 0.64 0.78 0.71 1.00 1.00 1.00 1.00 0.86 0.72 0.57 0.79 1.00<br />

Adj. Flow (vph) 81 813 66 0 0 0 0 235 58 86 387 0<br />

RTOR Reduction (vph) 0 8 0 0 0 0 0 0 44 0 0 0<br />

Lane Group Flow (vph) 0 952 0 0 0 0 0 235 14 86 387 0<br />

Confl. Peds. (#/hr) 10 10 10 10<br />

Parking (#/hr) 10<br />

Turn Type Perm NA NA Perm pm+pt NA<br />

Protected Phases 2 8 7 4<br />

Permitted Phases 2 8 4<br />

Actuated Green, G (s) 25.9 13.0 13.0 23.8 23.8<br />

Effective Green, g (s) 26.9 14.0 14.0 24.8 24.8<br />

Actuated g/C Ratio 0.45 0.23 0.23 0.41 0.41<br />

Clearance Time (s) 5.2 5.1 5.1 4.6 5.1<br />

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0<br />

Lane Grp Cap (vph) 1354 391 324 381 692<br />

v/s Ratio Prot 0.14 0.03 c0.23<br />

v/s Ratio Perm 0.32 0.01 0.07<br />

v/c Ratio 0.70 0.<strong>60</strong> 0.04 0.23 0.56<br />

Uniform Delay, d1 13.3 20.5 17.8 11.3 13.4<br />

Progression Factor 1.49 1.00 1.00 1.64 1.41<br />

Incremental Delay, d2 3.0 2.6 0.1 0.2 0.5<br />

Delay (s) 22.8 23.1 17.9 18.7 19.4<br />

Level <strong>of</strong> Service C C B B B<br />

Approach Delay (s) 22.8 0.0 22.1 19.3<br />

Approach LOS C A C B<br />

Intersection Summary<br />

HCM 2000 Control Delay 21.7 HCM 2000 Level <strong>of</strong> Service C<br />

HCM 2000 Volume to Capacity ratio 0.68<br />

Actuated Cycle Length (s) <strong>60</strong>.0 Sum <strong>of</strong> lost time (s) 11.9<br />

Intersection Capacity Utilization 71.2% ICU Level <strong>of</strong> Service C<br />

Analysis Period (min) 15<br />

c Critical Lane Group<br />

PM Peak 5:00 pm 11/7/2012 2035 build conditions Synchro 7 - Report<br />

Page 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!