sr 60 “twin pairs” - City of Vero Beach
sr 60 “twin pairs” - City of Vero Beach
sr 60 “twin pairs” - City of Vero Beach
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
HCM Signalized Intersection Capacity Analysis<br />
9: SR <strong>60</strong> WB & 11 Avenue<br />
11/13/2012<br />
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR<br />
Lane Configurations<br />
Volume (vph) 0 0 0 17 858 53 24 122 0 0 43 44<br />
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900<br />
Lane Width 12 12 12 12 11 12 12 12 12 12 12 12<br />
Total Lost time (s) 3.9 4.0 4.2 4.2 4.2<br />
Lane Util. Factor 0.86 1.00 1.00 1.00 1.00<br />
Frt 0.99 1.00 1.00 1.00 0.85<br />
Flt Protected 1.00 0.95 1.00 1.00 1.00<br />
Satd. Flow (prot) 6123 1770 1863 1863 1583<br />
Flt Permitted 1.00 0.49 1.00 1.00 1.00<br />
Satd. Flow (perm) 6123 913 1863 1863 1583<br />
Peak-hour factor, PHF 1.00 1.00 1.00 0.70 0.87 0.71 0.75 0.73 1.00 1.00 0.92 0.92<br />
Adj. Flow (vph) 0 0 0 24 986 75 32 167 0 0 47 48<br />
RTOR Reduction (vph) 0 0 0 0 13 0 0 0 0 0 0 41<br />
Lane Group Flow (vph) 0 0 0 0 1072 0 32 167 0 0 47 7<br />
Turn Type Perm NA pm+pt NA NA Perm<br />
Protected Phases 6 3 8 4<br />
Permitted Phases 6 8 4<br />
Actuated Green, G (s) 34.3 15.1 15.1 7.3 7.3<br />
Effective Green, g (s) 35.8 16.1 16.1 8.3 8.3<br />
Actuated g/C Ratio 0.<strong>60</strong> 0.27 0.27 0.14 0.14<br />
Clearance Time (s) 5.4 5.0 5.2 5.2 5.2<br />
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0<br />
Lane Grp Cap (vph) 3653 299 499 257 218<br />
v/s Ratio Prot 0.01 c0.09 0.03<br />
v/s Ratio Perm 0.18 0.02 0.00<br />
v/c Ratio 0.29 0.11 0.33 0.18 0.03<br />
Uniform Delay, d1 5.9 16.5 17.6 22.9 22.4<br />
Progression Factor 0.90 1.00 1.00 1.00 1.00<br />
Incremental Delay, d2 0.2 0.2 0.4 0.3 0.1<br />
Delay (s) 5.6 16.7 18.0 23.2 22.4<br />
Level <strong>of</strong> Service A B B C C<br />
Approach Delay (s) 0.0 5.6 17.8 22.8<br />
Approach LOS A A B C<br />
Intersection Summary<br />
HCM 2000 Control Delay 8.5 HCM 2000 Level <strong>of</strong> Service A<br />
HCM 2000 Volume to Capacity ratio 0.33<br />
Actuated Cycle Length (s) <strong>60</strong>.0 Sum <strong>of</strong> lost time (s) 12.1<br />
Intersection Capacity Utilization 38.9% ICU Level <strong>of</strong> Service A<br />
Analysis Period (min) 15<br />
c Critical Lane Group<br />
PM Peak 5:00 pm 11/7/2012 2035 no-build conditions Synchro 8 Report<br />
Page 9