21.07.2013 Views

Cuyahoga County: Public Safety Answering Point ... - Cleveland.com

Cuyahoga County: Public Safety Answering Point ... - Cleveland.com

Cuyahoga County: Public Safety Answering Point ... - Cleveland.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Cuyahoga</strong> <strong>County</strong>: PSAP Assessment<br />

Two individual meetings with West<strong>com</strong> <br />

One individual meeting with East<strong>com</strong> <br />

Three individual meetings with SouthWest Regional Dispatch<br />

Group<br />

Three individual meetings with SouthEast Regional Dispatch<br />

Group<br />

Three individual meetings with Chagrin Valley/Solon Regional<br />

Dispatch Group<br />

One individual meeting regarding Regional Firing Range <br />

Two individual meetings with Strongsville around Dispatcher<br />

Certification Program and Standard Operating Guidelines<br />

Re<strong>com</strong>mendations Report preparation and review <br />

Preliminary ‘Re<strong>com</strong>mendations Report’ review with <strong>Cuyahoga</strong><br />

<strong>County</strong><br />

Report follow-up edits or redirects <br />

Conduct time motion studies for select PSAPs <br />

Report Presentation & Delivery <br />

AT&T Meeting <br />

<strong>Public</strong> PSAP Review Meeting Jan. 20, 2012<br />

2.4 Project Assumptions<br />

The following assumptions were made in developing this proposal:<br />

Attevo’s interpretation of the requirements as <strong>com</strong>municated by <strong>Cuyahoga</strong><br />

<strong>County</strong> is accurate.<br />

Attevo and <strong>Cuyahoga</strong> <strong>County</strong> mutually agree that not all 47 PSAPs may<br />

choose to participate in the assessment interviews, surveys, requests for<br />

information, etc.<br />

Participating PSAP’s may not share all organizational or budget<br />

information.<br />

Timing of the engagement is dependent upon PSAP personnel availability<br />

for meetings and answering questions including the initial survey.<br />

The project team will attempt up to three times to ac<strong>com</strong>modate the<br />

schedule of the PSAP personnel for an interview and/or request for<br />

information.<br />

Physical and electronic access to appropriate data, networks and<br />

applications will be provided with minimal delay.<br />

Attevo personnel will have access to project work space and equipment as<br />

necessary and are not restricted to weekday, 8 hour per day work times.<br />

Should new effort be determined necessary or tasks be reassigned to<br />

Attevo personnel, the Change in Scope will be documented in a new<br />