24.07.2013 Views

Download PDF - ChartNexus

Download PDF - ChartNexus

Download PDF - ChartNexus

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

154<br />

SapuraCrest Petroleum Berhad<br />

Annual Report 2010<br />

noteS to the FinAnCiAl StAtementS<br />

31 January 2010<br />

38. SigniFiCAnt eventS (Cont’D)<br />

e) On 2 October 2009, SapuraAcergy Sdn Bhd, a jointly controlled entity, was awarded a contract from Apache Energy Limited for<br />

the transportation and installation of offshore facilities in Australia (“Works”).<br />

The engineering and project preparations will commence immediately, while offshore installation is scheduled to commence in<br />

late 2010.The Works are expected to be completed by early 2011 and the value of the contract is approximately USD170 million.<br />

f) On 24 December 2009, TL Offshore Sdn Bhd (“TLO”), a wholly owned subsidiary of the Company, was awarded a joint contract<br />

(“Contract”) by 11 of Petronas’ Production Sharing Contractors (“PSCs”) for the provision of works and services for the<br />

transportation and installation of offshore oil and gas facilities and structures for the PSCs for the years 2010 to 2012 (“Works”)<br />

with options for 2 further extensions of 1 year each. The scope of Works and the project schedule shall be specified and<br />

determined on a yearly basis. The price for the confirmed scope of Works for the year 2010 is approximately RM1.5 billion.<br />

Works are expected to commence in March 2010 around various offshore locations in Malaysian waters.<br />

g) On 22 January 2010, Offshore International FZC, a jointly controlled entity, received a Notice of Award from Larsen & Toubro<br />

Limited for the provision of works and services for the transportation and installation of four platform jackets in the Mumbai<br />

High North Field, offshore Mumbai (“Works”).<br />

Works are expected to commence in November 2010 and to be completed in January 2011. The price for the Works is<br />

approximately USD75 million.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!