06.08.2013 Views

E9 to E28 NKR Service Manual.pdf - Industrial Air

E9 to E28 NKR Service Manual.pdf - Industrial Air

E9 to E28 NKR Service Manual.pdf - Industrial Air

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

16.4.29 F99 (Output Over Current Detection)<br />

Malfunction Decision Conditions<br />

During operation of cooling and heating, when an output over-current (DC peak current value at IPM Prevention<br />

Control) is detected by checking the current that flows in the inverter DC peak sensing circuitry.<br />

Malfunction Caused<br />

Faulty outdoor unit PCB<br />

Faulty compressor<br />

Troubleshooting<br />

Checking the power transis<strong>to</strong>r<br />

Never <strong>to</strong>uch any live parts for at least 10 minutes after turning off the circuit breaker.<br />

If unavoidable necessary <strong>to</strong> <strong>to</strong>uch a live part, make sure the power transis<strong>to</strong>r’s supply voltage is below 50V using<br />

the tester.<br />

For the UVW, make measurement at the Fas<strong>to</strong>n terminal on the board of the relay connec<strong>to</strong>r.<br />

Tester’s negative terminal Power transis<strong>to</strong>r (+) UVW Power transis<strong>to</strong>r (-) UVW<br />

Tester’s positive terminal UVW Power transis<strong>to</strong>r (+) UVW Power transis<strong>to</strong>r (-)<br />

Normal resistance Several kΩ <strong>to</strong> several MΩ<br />

Abnormal resistance 0 or ∞<br />

138

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!