06.08.2013 Views

E9 to E28 NKR Service Manual.pdf - Industrial Air

E9 to E28 NKR Service Manual.pdf - Industrial Air

E9 to E28 NKR Service Manual.pdf - Industrial Air

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6 Secure the power supply cord and connecting cable on<strong>to</strong> the control board with the holder.<br />

7 Attach the control board cover back <strong>to</strong> the original position with the screw.<br />

8 For wire stripping and connection requirement, refer <strong>to</strong> instruction 11.2.4 of the indoor unit.<br />

WARNING<br />

This equipment must be properly earthed.<br />

Note: Isolating Devices (Disconnecting means) should have minimum 3.0 mm contact gap.<br />

Earth wire shall be Yellow/Green (Y/G) in colour and longer than other AC wires for safety reason.<br />

Always ensure all above connections compliant with national wire rules.<br />

11.3.5 Piping Insulation<br />

1 Please carry out insulation at pipe connection portion as mentioned in Indoor/Outdoor Unit Installation<br />

Diagram. Please wrap the insulated piping end <strong>to</strong> prevent water from going inside the piping.<br />

2 If drain hose or connecting piping is in the room (where dew may form), please increase the insulation by<br />

using POLY-E FOAM with thickness 6 mm or above.<br />

71

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!