E9 to E28 NKR Service Manual.pdf - Industrial Air
E9 to E28 NKR Service Manual.pdf - Industrial Air
E9 to E28 NKR Service Manual.pdf - Industrial Air
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
13.13.1.7 Setting Position Judgment<br />
According <strong>to</strong> installation position when there is only one activity area detected, the horizontal airflow direction<br />
louver position is fixed according <strong>to</strong> chart below:<br />
Target area<br />
Horizontal airflow direction louver position<br />
Left installation Center installation Right installation<br />
A 3 2 2<br />
B 1 1 1<br />
C 5 5 4<br />
Louver position refer <strong>to</strong> horizontal airflow direction control.<br />
When 2 activity areas have been detected, according <strong>to</strong> Human Activity Level, the timing of horizontal airflow<br />
direction louver steps at the targeted activity areas is judged.<br />
Operation mode Activity level difference Louver s<strong>to</strong>p time<br />
Cooling<br />
1 level<br />
2 levels<br />
Higher Activity level ≈ 60 seconds<br />
Lower Activity level ≈ 30 seconds<br />
Higher Activity level ≈ 60 seconds<br />
Lower Activity level ≈ 8 seconds<br />
When 3 activity areas have been detected, according <strong>to</strong> Human Activity Level the timing of horizontal airflow<br />
louver steps at the targeted activity areas is judged.<br />
Operation mode Activity level Louver s<strong>to</strong>p time<br />
Cooling<br />
Hi<br />
Me<br />
Lo<br />
≈ 45 seconds<br />
≈ 30 seconds<br />
≈ 20 seconds<br />
When 3 activity areas have same activity level, the horizontal airflow direction louver will swing left and right.<br />
13.13.2 Setting Temperature and Fan Speed Shift<br />
Cooling Dual Sensor<br />
91