L LOCA RE AL ELAT GOV TÓR VER RIU LO RNA GOV OKÁ ... - Unmit
L LOCA RE AL ELAT GOV TÓR VER RIU LO RNA GOV OKÁ ... - Unmit
L LOCA RE AL ELAT GOV TÓR VER RIU LO RNA GOV OKÁ ... - Unmit
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
BO OBONAR RO<br />
Status of o EDTL power r<br />
Generators<br />
Number of gen nerators working g<br />
Numeru Gera ador nia servisu<br />
Number of gen nerators under re epair<br />
Numeru Gera ador nebe iha<br />
manutensaun<br />
Total number of generators<br />
Totál numeru gerador sira<br />
Jan<br />
Jan<br />
Daily capacity y of electricity supply<br />
(kw)<br />
Kapasidade el letrisidade loron-loron<br />
nian (kw)<br />
Possibility of additional a capacit ty of<br />
electricity gen neration (kw)<br />
4732 4732 4732 4409 4006<br />
Posibilidade kapasidade k husi<br />
eletrisidade ne ebe aumenta nia<br />
produsaun<br />
495 495 495 818 1221<br />
Full capacity of o generators (kw w)<br />
Gerador nia kpasidade k tomak (kw)<br />
5227 5227 5227 5227 5227<br />
Source e: district EDTL Office _ 15 July y 2011<br />
Fonte: Electricidade De D Timor-Leste ih ha Distritu _ 15 Jullu 2011<br />
EDTL L Station in i Bobonaro o District has h 12<br />
gener rators with different d cap pacity (kw). There<br />
are 6 generators in EDTL-M Maliana and other o 6<br />
gener rators in EDTL E sub- -stations in n sub-<br />
distri icts. Mr. Luis L dos Sa antos, Mana ager of<br />
District<br />
EDTL in nformed that t all generato ors are<br />
work king well. Th he lowest capacity<br />
gene erators<br />
are of<br />
65kw with h mark Volv vo Penta loca ated in<br />
EDTL L sub-district<br />
Bobonaro o and the highest h<br />
capac city is of 12 200kw mark Cummins located l<br />
in ED DTL power station s in Ma aliana.<br />
12<br />
2<br />
14<br />
Feb<br />
Fev<br />
Mar<br />
Mar<br />
12 12<br />
2 2<br />
14 14<br />
Apr<br />
Abr<br />
May<br />
Mai<br />
11 11<br />
3 3<br />
14 14<br />
135<br />
Jun<br />
Juñ<br />
2011<br />
Jul<br />
Jul<br />
N/A 12<br />
N/A 0<br />
12<br />
N/A 4622<br />
N/A 514<br />
5136<br />
Local Goverrnance<br />
Report – July 2011<br />
RRelatóriu<br />
Goverrnasaun<br />
Lokál – Jullu 2011<br />
Aug<br />
Ago<br />
BOOBONAARu<br />
Sep<br />
Set<br />
Oct<br />
Out<br />
Nov<br />
Nov<br />
Dec<br />
Dez<br />
EDDTL<br />
Estasauun<br />
iha Distriitu<br />
Bobonarro<br />
iha 12<br />
ho diferente kapasidade (kw) nebee<br />
iha 6<br />
disttribui<br />
in Kapital<br />
Distrritu<br />
no 6 siira<br />
seluk<br />
disttribui<br />
iha SSub-Distritu<br />
sira. Sr. LLuis<br />
dos<br />
Sanntos,<br />
Manager<br />
EDTL Diistriitu<br />
informma<br />
katak<br />
jeraador<br />
sira hhotu<br />
agora dadaun oopera<br />
ho<br />
konndisaun<br />
diakk,<br />
ida ki’ik lliu<br />
ho kapassidade<br />
65<br />
Kww<br />
ho marka a Volvo Pennta<br />
nebe lokkadu<br />
iha<br />
Subb-Distritu<br />
BBobonaro<br />
nno<br />
ida hoo<br />
marka<br />
cummmins<br />
nebee<br />
alokadu iha EDTLL<br />
central<br />
maaliana<br />
ho kappasidade<br />
12000kw.