<strong>KCE</strong> Reports 74 Hyperbaric Oxygenation Therapy 69<br />

Table 17. Required time for management and administration<br />

Required time Required personnel<br />

For multiplace scenarios<br />

Administration<br />

For monoplace scenarios<br />

30 min. fixed administration per<br />

session<br />

+ 6 min. per patient<br />

1 nurse<br />

Administration 30 min. per session 1 nurse<br />

Table 18. Weekly/Yearly work schedule<br />

Treatment days/week 5 days/week<br />

Treatment weeks/year 48 weeks/year<br />

For the cost of the hyperbaric physician, the average cost of an emergency care<br />

specialist or an anaesthesiologist with an average seniority of 20 years at two university<br />

hospitals is used. For the cost of a nurse, the average cost of an A1 and A2 nurse with<br />

an average seniority of 20 years at two university hospitals is used (Table 19). The<br />

assumptions to calculate the cost per hour for each of the staff members are shown in<br />

Table 20.<br />

Table 19. Average cost per FTE<br />

Average Yearly Cost Average Gross wage per<br />

Employee per FTE*<br />

FTE<br />

Physician 151 000 101 000<br />

Nurse (average A1,<br />

A2)<br />

58 500 37 500<br />

Nurse A1 62 000 40 000<br />

Nurse A2<br />

FTE: full time equivalent<br />

55 000 35 000<br />

* including gross wage, employer’s contributions (35% on gross wage), holiday pay (legally at 92%<br />

of gross month wage), end of year pay (~30 % of gross month wage + 35% employer’s<br />

contributions). Including also an indirect personnel cost of 4 000€ per FTE for HR services, HR<br />

administration, office equipment, IT, telecom and other administrative costs (source: UZA).<br />

Table 20. Personnel parameters<br />

Working hours / week<br />

per FTE<br />

38<br />

Working weeks / year<br />

per FTE<br />

45 Taking into account holidays<br />

% productive hrs / total 90% Taking into account sick time and other service-<br />

working hrs<br />

related duties (general meetings, training, …)<br />

5.9.2.2 Equipment maintenance<br />

For a 6-person multiplace chamber, we received an estimate for equipment<br />

maintenance cost from AZ Sint Jan Brugge. For a 12-person multiplace chamber, we<br />

received an estimate from UZ Antwerpen. This maintenance cost includes preventive<br />

and corrective maintenance, replacement of components and a maintenance contract<br />

with the supplier. As a percentage of the above mentioned investment price, the<br />

maintenance cost varied from 1.4% to 1.5%. Therefore, we assume a mean maintenance<br />

cost of 1.5% (with a range of 1 to 2%) (Table 21).