107 Check the very short SHV-SHV cables <strong>for</strong> damage: They are poorly<br />

made – very unreliable. Complain <strong>at</strong> EI shop (see 94): Markus +<br />

Christian. 4 SHV bad cables found (still working, but plastic insul<strong>at</strong>ion<br />

<strong>at</strong> connector damaged) => put in “useful broken cable”-box<br />

1/30/2009<br />

108 Manifold: Replace one valve with a lockable one. Totti did it. 8/15/2008<br />

109 Phosphor: Front phosphor was weak and peeling off in vacuum (too<br />

much glue ?). Totti spoke to David K. about flaking phosphor: We<br />

made the layer too thick. He will help with air brushing phosphor on<br />

glass pl<strong>at</strong>es – Totti and David did it. Small Phosphor or Scintill<strong>at</strong>or <strong>for</strong><br />

spectrometer arm is still missing – Totti did it. See also 123 and 138<br />

92 <br />

SAFETY: Check regul<strong>at</strong>ors <strong>for</strong> leaks and appropri<strong>at</strong>e range (high<br />

pressure). Markus + Christian<br />

111 Rods <strong>for</strong> anode cylinders are still missing. Ken is on it. Totti will check.<br />

Done and installed. Needed rewiring. Test would be good…<br />

112 SAFETY: Check crane post <strong>for</strong> missing screws. Replace broken<br />

brackets. Totti did it – not all the screws are in but it seems ok.<br />

113 SAFETY: Check crane wheel <strong>at</strong> the tip. Totti did it and gener<strong>at</strong>ed a<br />

required crane log book<br />

114 We need a NIM-NIM power cable – 10 feet long<br />

115 Oil <strong>for</strong> the small 4 turbo pumps needs to be ordered from Pfeiffer:<br />

Totti. Ordered 8/20/09. Arrived 9/3/09. Inserted 9/8/09.<br />

116 Redesign MCP Holder pl<strong>at</strong>e <strong>for</strong> Hexdetector and Quad 80 (similar to<br />

DLD120). Markus; will be finished by end of Oct. Still in machine shop.<br />

(Jan 2009)<br />

117 Ion Gauge in Source Chamber: Replace broken filament (David K.<br />

might help us out). New filament available in ALS shop ($70) but we<br />

might be able to use a filament from the old ion gauges. Totti did it,<br />

see below.<br />

118 SAFETY: Replace the 30 year old ion gauges with new ones. Cables<br />

to connect to the old controllers have to be fabric<strong>at</strong>ed though (EM<br />

shop). Totti is on it and bought 3 gauges. Gauges are installed and the<br />

broken one is repaired with a filament of an old ion gauge. NOTE: We<br />

are not oper<strong>at</strong>ional because of the cables! EI people will order 4 “pigtails”<br />

and modify our old cables. Work in progress. Done – test needed<br />

(Markus who has to per<strong>for</strong>m the vacuum test: 1/16/09 test done –<br />

cable were wired the wrong way by EI shop). Now everything is ok.<br />

12/01/2008<br />

January<br />

2009<br />

9/1/2008<br />

8/17/2008<br />

11/30/2008<br />

9/8/2009<br />

2/18/2009<br />

8/16/2008<br />

10/1/2008<br />