138 We need 5mm wide and 5cm long glass pl<strong>at</strong>es <strong>for</strong> the phosphor and<br />

help from David Kilcoyne with airbrushing. Totti ordered new glass<br />

cutter. Sun cut the class pl<strong>at</strong>es. Totti and Sun will approach David and<br />

Hendrik. Phosphor is on pl<strong>at</strong>es (thanks to David). Pl<strong>at</strong>es were tested<br />

<strong>at</strong> HH Laser in 458. We saw something and taking in account th<strong>at</strong> this<br />

was 10Hz it might work <strong>at</strong> the ALS. Totti remains skeptical…<br />

139 Helmholtz Powersupplies need place to store them. Ask in building 2<br />

and so on…: Markus. One powersupply (800 A / 20 V) got stored in<br />

storage (warehouse). No place <strong>for</strong> the PowerTen powersupply has<br />

been found yet (Feb. 2009). Put Powerten Powersupply in the back of<br />

building 7 and labeled it 9/30/09.<br />

140 SAFETY: New Helmholtz coils need save cable and w<strong>at</strong>er hose<br />

connection. Plastic box is needed or similar. Markus will check back<br />

on EI shop. => Plastic box is fine, still waiting <strong>for</strong> official safety<br />

inspectors (April. 2009). M. Bell: “No w<strong>at</strong>er leak detection needed but<br />

flow controller is desirable” (March. 2009). Temper<strong>at</strong>ure sensor would<br />

be a good idea as well. Mike Bell took over. Done 7/31/09.<br />

141 SAFETY: Administr<strong>at</strong>ive lockout procedure <strong>for</strong> gas manifold + labels +<br />

swagelok cap are needed. Rene put cap on a chain, Totti made Alu<br />

labels and wrote the admin. Procedure (which was <strong>for</strong>warded to the<br />

ALS safety staff by Dec. 18). Input from Donna Hamamoto and Will<br />

Thur are expected <strong>for</strong> January 2009. No feedback to two more emails<br />

– case closed <strong>for</strong> now.<br />

142 Ne spectrometer has to be simul<strong>at</strong>ed (Allen) and constructed and<br />

fitted to the chamber + the right offset flange has to be found and<br />

mounted (Markus).<br />

143 SAFETY: Portable box with Personal Protective Equipment <strong>for</strong> the<br />

ALS beamtimes is needed (containing gloves, earplugs, earmuffs,<br />

glasses, goggles…). Totti and Sun put something together. Wrong<br />

earmuffs were delivered (RMA in process). Box still needs some<br />

labels about the contents on the outside (Totti did it – waiting <strong>for</strong><br />

Earmuffs: Sun got them).<br />

144 Spare blue HP NIM bin with broken 12V and a silver Tenelec NIM bin<br />

with broken 6V was found <strong>at</strong> salvage area. Totti gave it to Eric Henson<br />

(who is in the hospital <strong>for</strong> some weeks) <strong>for</strong> repair around Dec. 18 and<br />

Jan. 22/08. Eric is out <strong>for</strong> a couple of months (3/31/09). Eric is back<br />

but hasn’t started yet (9/10/09). Totti picked them up and brought<br />

them to the ALS (3/21/10).<br />

=> moved down<br />

12/06/2008<br />

9/30/2009<br />

7/31/2009<br />

1/22/2009<br />

2/20/2009<br />

1/12/2008<br />

13