179 (8/2/09) Ion getter pump <strong>at</strong> BL 11 has to be moved out of the way.<br />

Talk to Hendrik. Totti + Markus + Support<br />

9/29/09 Remind Hendrik again end of November, begin December<br />

(Shutdown in December). Totti writes email to Hendrik & Tolek<br />

10/28/09. Did it: got positive reply on this.<br />

12/07/09 Ion getter pump will not be moved away, but whole chamber<br />

disconnected from beamline. Center pipe will also be dismounted.<br />

180 (8/2/09) BL 11 needs glass valve <strong>for</strong> speeding up alignment process.<br />

Talk to Hendrik. Totti + Markus + Support. Bruce Rude has thicker<br />

glass window <strong>for</strong> VAT g<strong>at</strong>e valve to comply with safety standard. Tony<br />

Warwick has to be contacted and involved <strong>for</strong> the safety issues <strong>at</strong> the<br />

ALS. Totti spoke to Tony and Jim Floyd: No radi<strong>at</strong>ion problem just<br />

mechanical stability. Bruce Rude can give us the right window (he<br />

also has the tool to mount it). Totti writes email to Hendrik & Tolek<br />

10/28/09. Did it: got neg<strong>at</strong>ive reply on this. Wh<strong>at</strong> now ?<br />

= moved down<br />

181 (8/3/09) the new Helmholtz coils need two separ<strong>at</strong>e w<strong>at</strong>erlines to be<br />

reserved <strong>at</strong> BL 11. Talk to Hendrik. Totti + Markus + Support. Markus<br />

let w<strong>at</strong>erlines hanging <strong>at</strong> BL. Totti put remark on beamtime<br />

prepar<strong>at</strong>ion list (8/25/09):<br />

http://amo-csd.lbl.gov/downloads/Checklist%20<strong>for</strong>%20Beamtime.pdf<br />

182 (8/2/09) New Helmholtz coils need fix<strong>at</strong>ions: 8020 clamp on top and<br />

8020 (with brackets) <strong>at</strong> chamber frame (left and right post). Totti +<br />

Markus. 8020 brackets determined to be 5.5in long. Totti found 8020<br />

m<strong>at</strong>erial, cut it and mounted the pieces. We need to order brackets<br />

and plastic end caps from 8020 plus more Velcro straps from<br />

McMasters… (8/26/09). Totti orders from 8020. Markus orders from<br />

McMaster (9/10/09). 8020 arrived 9/19/09. Totti put plastic caps +<br />

brackets + velcro on 9/23/09. Test mount 8/25/09: works<br />

12/07/2009<br />