Todo List for COLTRIMS setup: - AMOS Experiment at LBNL
Todo List for COLTRIMS setup: - AMOS Experiment at LBNL
Todo List for COLTRIMS setup: - AMOS Experiment at LBNL
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
166 Long CF150 spool + bello <strong>for</strong> spectrometer + frame or stand has to be<br />
in place Markus. Parts designed and machine shop. Vacuum parts<br />
found – some need testing (see 175). Need to order 8020 parts: goes<br />
out with stuff <strong>for</strong> Christian <strong>for</strong> cart (4/24/09). Assembled (5/5/09).<br />
Vacuum test needed. Vacuum is fine (7/14/09)<br />
167 Rail <strong>for</strong> phosphor screen needs makeover Totti took it out of the<br />
chamber and brought it to the machine shop. Rene is on it 3/30/09.<br />
Totti fi(l)ne tuned the rail system and did a first adjustment. Should<br />
work a little better now. Totti noticed th<strong>at</strong> the black handle <strong>at</strong> the end<br />
got loose a little bit and tighten it again using both little setscrews<br />
(weak point)…<br />
168 One more layer of phosphor on the glasses would be nice Totti +<br />
David. More tests in the meantime shows th<strong>at</strong> it works the way it is <strong>for</strong><br />
now<br />
169 SAFETY: CSD guest procedure, Gasmanifold, JHA, AHD, OJT,<br />
Emergency Shutdown <strong>List</strong> have to be in place Totti (is in contact with<br />
Tracey Bigelow from HR; goes very slowly). Looks like EID can be<br />
issued perhaps 2 to 3 weeks in advance. PGI <strong>for</strong>m has to be filled out<br />
be<strong>for</strong>e by every guest by all means 4/14/09. W<strong>at</strong>ch out: There is a<br />
new PGI <strong>for</strong>m (un<strong>for</strong>tun<strong>at</strong>ely write protected). Because of th<strong>at</strong> and a<br />
missing internet interface <strong>at</strong> CSD we go via ALS again. We added a<br />
new AHD like document <strong>for</strong> people to read be<strong>for</strong>e they work with the<br />
<strong>COLTRIMS</strong> appar<strong>at</strong>us. The <strong>LBNL</strong> JHA system will face an overhaul<br />
within 6 to 12 months. We have to wait <strong>for</strong> this outcome.<br />
170 Apertures insets <strong>for</strong> slits in chamber needed Markus made one.<br />
Daniel may makes a better version (no not really).<br />
171 Program <strong>for</strong> autom<strong>at</strong>ic Backup (like FileSync) is needed Christian<br />
installed it. It should be implemented in the red background box. Totti<br />
put something together <strong>for</strong> coltrims/lbl and local account…<br />
172 Spectrometer simul<strong>at</strong>ions <strong>for</strong> He experiment Markus is on it. Done:<br />
Total spectrometer length 1.5 m<br />
173 SAFETY: Noise exposure in labs 102 and 104. Totti is in contact with<br />
Herb Toor and Rich Mc Clure from facilities <strong>for</strong> tests (Herb will show<br />
up in 104 Mar. 23; <strong>for</strong> 102 we have to give him a holler once the<br />
appar<strong>at</strong>us is running again). According to Herb: no probs (72 to 77db)<br />
in 104 and 106. Herb stopped by July 14, 09 to check the noise level<br />
in 102. It came out to 79db, which is no problem.<br />
Herb measured the compressed air nozzles (9/24/09). The have<br />
100dB – thus hearing protection is highly recommended. Totti put<br />
warning signs in the three labs.<br />
7/14/2009<br />
3/31/2009<br />
6/17/2010<br />
7/10/2009<br />
8/1/2009<br />
3/30/2009<br />
4/12/2009<br />
7/14/2009<br />
9/24/2009<br />
17