76 New 2 nd (and 3 rd ?) harddrive <strong>for</strong> D<strong>at</strong>a acquisition computer has to be<br />
ordered and mounted (SATA): M<strong>at</strong>thias ordered two and installed<br />
them.<br />
77 SAFETY: Connection <strong>for</strong> 300A power supply (208VAC/50A) plus<br />
safety shield around electrodes: Totti, Evan and Steve Cooper. Device<br />
is in EI shop<br />
Spring<br />
2008<br />
Summer<br />
2008<br />
78 On/Off switch <strong>for</strong> scroll pump is needed: Totti and Steve Cooper Spring<br />
2008<br />
79 Need convectron <strong>for</strong> 1 st stage: Felix and Totti Spring<br />
2008<br />
80 Need convectron <strong>for</strong> gas manifold: Felix and Totti Spring<br />
2008<br />
81 W<strong>at</strong>er connection in 102: Felix and Sun Spring<br />
2008<br />
82 Need gases and regul<strong>at</strong>ors <strong>for</strong> N2, CO, CO2, Ne: Felix and Sun Summer<br />
2008<br />
83 80mm detectors have to be reassembled: Felix and Sun (+Totti) Summer<br />
2008<br />
84 Stabilized Jet-he<strong>at</strong>ing; need controller, power supply and test<br />
Irina works on it<br />
6/17/2010<br />
85 SAFETY: Order Earmuffs: Felix Spring<br />
2008<br />
86 Coldtrap lids should be higher and might need holes: Felix Spring<br />
2008<br />
87 Mount CF150 cross <strong>for</strong> long spectrometer: Felix and Sun Spring<br />
2008<br />
88 Lab improvement list: All. Totti - no input from other team members Summer<br />
2008<br />
End of 2-Bunch-Run 8/2008<br />
89 Makeover of the differential pumping stage: Tube has to be part of the<br />
stage not of the chamber. postponed<br />