154 SAFETY: Anchor bolts in 102 were pulled out of the floor. Totti filed in<br />

work order 3/18/2009 and got in contact with Monroe Thomas. Hope<br />

to get got more help <strong>for</strong>m James Mankini… Mankini contacted Fred<br />

Angliss (he will stop by 4/1/09). Steve Cooper stepped in and<br />

contacted Tom Reese: Deeper drilling is necessary. Th<strong>at</strong> requires<br />

floor scanning. Steve Cooper arranged <strong>for</strong> floor scanning (4/1/09). The<br />

scanning report will be sent to James Mankini in the near future <strong>for</strong><br />

completion of the drill permit. In the meantime Fred Angliss took a look<br />

<strong>at</strong> the floor and concluded the following: A) the wrong anchor bolts<br />

were installed (they were not in agreement with his calcul<strong>at</strong>ions). B)<br />

The concrete is busted <strong>at</strong> two places, thus the tiles should come out in<br />

order to take a closer look. C) He recommends replacing all 8 anchor<br />

bolts with 3/8in HILTI KB-TZ, 2.5in embedded. The tiles have to be<br />

removed wherever the concrete is busted in order to conclude<br />

(together with Fred) if a deeper drilling would fix the problem or if the<br />

concrete needs to be fixed first (Carpenters do th<strong>at</strong> 4/2/09). Totti<br />

moved the chamber <strong>for</strong> this purpose. Tom Reese will then send<br />

somebody to take all 8 anchor bolts out. Done: Anchor bolts installed<br />

by carpenter (Warren Elliot). Chamber back in place.<br />

155 SAFETY: Main grounding cables have to remain with frame, pump<br />

cart or electronic rack. Totti put labels on except controller cart (we<br />

wait <strong>for</strong> the new cart here – done: Totti put label on 5/28/09)<br />

156 Electronic/Detector tests: a) test new decoupling boxes and voltage<br />

divider, b) lens potis, c) spectrometer voltage dividers, d) old<br />

decoupling cylinders (150 Ohm, contacts, cable configur<strong>at</strong>ion…), e)<br />

fast amplifier (need labels <strong>for</strong> polarity, amp. Factor) Christian.<br />

Everything soldered and ready to be tested 7/10/09 (we need a<br />

detector and spectrometer in vacuum). Done<br />

157 Spectrometer voltmeter (on the right hand side of the rack) has bad<br />

switch: fix it Totti. Took the front panel out and filed the slot <strong>for</strong> the<br />

button a little bigger. Works better but not gre<strong>at</strong>.<br />

158 MISTERS decoupling cylinders have to be modified as a back-up<br />

Christian. Done 7/10/09. Test is still needed.<br />

159 We have to buy more meshes (80%, 200 micron). We lost 7 sheets<br />

Markus. Quote requested (4/14/08). Ordered (4/20/09). Arrived and<br />

cut. Stuff was pretty crumpled on roll. Loss is estim<strong>at</strong>ed to 50%.<br />

Markus complained <strong>at</strong> TWP Inc. but they don’t care…<br />

160 We need a KF, CF and screw supply suitcase <strong>for</strong> the beamtime. Totti<br />

found something 3/25/09. Nuts & Bolts supply is fine. We need more<br />

supplies to fill the CF/KF suitcase. Totti bought some stuff, but KF25<br />

o-rings are missing <strong>for</strong> instance (ALS shop is out of it)… got some<br />

4/14/09. We now have the minimum equipment.<br />

4/7/2009<br />

3/31/2009<br />

7/28/2009<br />

3/24/2009<br />

7/28/2009<br />

4/30/2009<br />

4/14/2009<br />