Todo List for COLTRIMS setup: - AMOS Experiment at LBNL
Todo List for COLTRIMS setup: - AMOS Experiment at LBNL
Todo List for COLTRIMS setup: - AMOS Experiment at LBNL
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
119 <br />
Convectron gauge in Manifold has problem: Try to readjust or replace.<br />
Markus + Christian; starts with 17 and 123. Oct. 15. => Manifold<br />
convectron gauge shows right pressure.<br />
120 Repair Phillips CFD 715: Center channel jumps in time (seen on<br />
computer, it is not a cable delay problem). Give to Eric Henson. Totti<br />
did it<br />
January<br />
2009<br />
8/15/2008<br />
121 Repair Ortec 441 R<strong>at</strong>emeter. Give to Eric Henson. Totti did it 8/15/2008<br />
122 Powersupply of Helmholtz coils: Display is broken; maybe more. Give<br />
to EM shop. Totti did it. Back from repair. Should work.<br />
123 Open the jet which got clogged during summer beamtime: Clean the<br />
nozzle. Get new Swagelok filter. Remove mesh in front of nozzle !?<br />
Totti prepared dismount of turbo pump. Markus + Christian. Markus<br />
cleaned nozzle and put stuff back together. Jettest and vacuum test<br />
(also of the phosphor feedthrough) is still needed. First test gave<br />
factor too small rise in jetdump. Reopened and reduced the distance<br />
to skimmer from 11 to 5 mm. Now jet is working fine (no new filter was<br />
implemented though).<br />
8/15/2008<br />
1/21/2009<br />
124 Check all 5 NIM bins (each slot) <strong>for</strong> voltages. Totti did it 8/16/2008<br />
125 Pin <strong>at</strong> 120mm quad anode fell off. Solder…. Totti did it 8/16/2008<br />
126 Re-center the Chamber on the frame. Adjust the little frame <strong>for</strong> the<br />
differential pumping stage. Totti did it<br />
127 SAFTEY: Earthquake brackets <strong>for</strong> Chambers in 102 and 104 are not<br />
safe. Redesign needed. Totti did it – prototype will be made by Rene.<br />
Prototype is now revised. Rene is making 12 stereotypes. Done and<br />
installed<br />
128 Harddrives in d<strong>at</strong>a acquisition and d<strong>at</strong>a analysis computer have to be<br />
replaced. Perhaps order four 500 GB HDs (check if BIOS would be<br />
happy with th<strong>at</strong>). Think of the possible options. M<strong>at</strong>thias ordered HDs<br />
and they arrived. However, there are not mounted yet. Markus will<br />
replace some: see 148.<br />
129 Monitor of d<strong>at</strong>a analysis computer has a problem. Might be still under<br />
warranty. Totti is on it. Sent it out <strong>for</strong> repair. Came back and was also<br />
broken. Send out again. Came back and works.<br />
130 SAFETY: Multiple outlets near w<strong>at</strong>er lines (within 6 feet) need plastic<br />
box: Totti did it<br />
8/16/2008<br />
9/9/2008<br />
12/01/2008<br />
9/11/2008<br />
8/22/2008<br />
11