14.08.2013 Views

Todo List for COLTRIMS setup: - AMOS Experiment at LBNL

Todo List for COLTRIMS setup: - AMOS Experiment at LBNL

Todo List for COLTRIMS setup: - AMOS Experiment at LBNL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

20 Chamber blind flange should turn into feedthrough flange. Totti has 4<br />

SHV 2 ¾ flange. We need an adapter to 6in. Sun is on it and found<br />

the parts<br />

Spring<br />

2007<br />

21 Oil <strong>for</strong> all turbo pumps have to be checked, e.g. replaced ! Sun did it… Summer<br />

2007<br />

22 We need a little stronger powersupply <strong>for</strong> the rainbow coils: Done by<br />

Totti<br />

23 We need a ruler on the exit slits inside the chamber: We have to find<br />

something made out of Aluminum. Sun did it<br />

24 We need two R<strong>AMOS</strong> boxes in lab 102 => Totti: Steve is on it and<br />

gets back to us. Outlets are installed.<br />

25 SAFETY: There are still chemicals in the lab: Wh<strong>at</strong> should we do ?<br />

Totti contacts Jerry….<br />

26 2 digital Frankfurt r<strong>at</strong>emeter desirable: Totti emailed to Reinhard and<br />

Lothar. Answer is “NO – not now”<br />

27 Exchange 3-fold SHV feedthrough with 4-fold SHV feedthrough: =><br />

Hunt <strong>for</strong> good one (1E-9Torr). Totti found one – hopefully it works.<br />

Sun mounted it. Gives good vacuum.<br />

28 SAFETY: Fasten the chamber to the ground. Totti: In progress…<br />

(Fred Angliss)<br />

Summer<br />

2007<br />

Summer<br />

2007<br />

Fall 2007<br />

Fall 2007<br />

Summer<br />

2007<br />

Summer<br />

2007<br />

Spring<br />

2008<br />

29 Get salvage parts from cleaning. Totti Spring<br />

2008<br />

30 Turn of the fume hood. Totti: Answer is “NO”. Hood is part of the AC<br />

system of lab 102<br />

31 Think about the use of a hex det and a 120mm <strong>for</strong> BL 10 experiment:<br />

Hex Det = Yes. Detectors have to be set-up (put together and look <strong>for</strong><br />

wiring). We have to find out how the 80mm detector can be mounted<br />

to the big spectrometer and how to lift the spectrometer or <strong>setup</strong> the<br />

big spectrometer<br />

32 Get in contact with Claude Linus and Dennis Collins <strong>at</strong> building 88:<br />

300A/30V Powersupply: Totti did it and got the powersupply<br />

Winter<br />

2007<br />

Summer<br />

2007<br />

Summer<br />

2007<br />

3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!