14.08.2013 Views

Todo List for COLTRIMS setup: - AMOS Experiment at LBNL

Todo List for COLTRIMS setup: - AMOS Experiment at LBNL

Todo List for COLTRIMS setup: - AMOS Experiment at LBNL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

33 We need an efficient beamdump <strong>for</strong> 30 to 55 eV photons (Woods<br />

Horn): We will mount a 6in bellow <strong>at</strong> the exit of the chamber. Support<br />

rods were constructed by Totti and are in the machine shop. We need<br />

a good stand <strong>for</strong> the 6in pipe then (found something made out of<br />

steel).<br />

34 Spectrometer has to be simul<strong>at</strong>ed and designed: Need in<strong>for</strong>m<strong>at</strong>ion<br />

about KER and Electron energy first. Sun’s job and she is on it<br />

35 Get in contact with David Kilcoyne from BL 10L Fluxcurves, beam<br />

height, space constraints etc. Sun and Totti<br />

Summer<br />

2007<br />

Spring<br />

2007<br />

Spring<br />

2007<br />

36 We need a big Ethylene gas bottle. Sun Summer<br />

2007<br />

37 A computer <strong>for</strong> Acquiris: Has been ordered by Totti and M<strong>at</strong>thias – it<br />

has to be set up once it is here. Done by Totti<br />

38 We have to check with David Kilcoyne again about: Polariz<strong>at</strong>ion and<br />

gas cell in front of our <strong>setup</strong> and reloc<strong>at</strong>ion of the two cabinets <strong>at</strong> the<br />

beamline. Totti and Sun will do th<strong>at</strong><br />

Summer<br />

2007<br />

Summer<br />

2007<br />

39 Setup spectrometer: Sun did it Summer<br />

2007<br />

40 Implement bellow into differential pumping stage and test <strong>for</strong> good<br />

pressure: Sun did it<br />

41 Detectors need new cables of the right length and a coppering on the<br />

electron side: Sun and Totti did it<br />

Summer<br />

2007<br />

Summer<br />

2007<br />

42 Turn the “B<strong>at</strong>man” (machine shop work): Sun did it Summer<br />

2007<br />

43 Look <strong>for</strong> Acetylene as a backup plan and CO <strong>for</strong> calibr<strong>at</strong>ion (in<strong>for</strong>m<br />

David th<strong>at</strong> we want to use the yellow gas cabinet): Sun did it<br />

44 Construct and <strong>setup</strong> a movable table <strong>for</strong> differential stage: Totti, Sun<br />

and Felix<br />

Summer<br />

2007<br />

Summer<br />

2007<br />

45 Software <strong>for</strong> Acquiris is missing: Frankfurt Fall 2007<br />

46 Preanalysis routine <strong>for</strong> C2H4 (PAW): Sun is on it Fall 2007<br />

47 Get Telescope from building 88 (Bob Shannon): Totti got it Spring<br />

2008<br />

4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!