cost inclusive <strong>of</strong> handling, procurement & all other incidental charges shall be<br />

recovered from the contractor.<br />

3.25.8. If the departmental <strong>road</strong> roller remains idle for due to contractor’s fault, its cost will be<br />

recovered from the contractor Rs 331.66 per hour.<br />

3.25.9. Hire plus establishment and other charges for idle or repair periods shall be payable <strong>by</strong><br />

the contractor.<br />

3.25.10. In the event or loss or theft <strong>of</strong> the machinery <strong>of</strong> any <strong>of</strong> its components in part or full<br />

when its stand <strong>issued</strong> to the contractor, the value <strong>of</strong> the lost particles will be recovered<br />

from the contractor at the price fixed <strong>by</strong> the S.E, or E.E concerned.<br />

3.26. Claims are not admissible under following circumstances.<br />

∗ Extra items <strong>of</strong> work down without written order <strong>of</strong> departmental <strong>of</strong>ficer.<br />

∗ In case <strong>of</strong> sudden fluctuant and or increase in rates <strong>of</strong> labour materials royalty various<br />

taxes railway freight fuel lubricant carriage cost etc. at any stage <strong>of</strong> the work.<br />

∗ Short supply and/or non-supply delay in supply <strong>of</strong> department materials and/or<br />

equipment and/or petrol diesel K. oil etc.<br />

∗ Non availability <strong>of</strong> local labour <strong>of</strong> a category required for the work.<br />

∗ Labour sitting idle due to any cause.<br />

∗ Delay in communication <strong>of</strong> decision regarding any change or modification in design<br />

drawing specification alteration addition etc.<br />

∗ Loss sustained due to.<br />

Acts <strong>of</strong> enemies including agitation public Rangdari and riot<br />

Transportation and procurement difficulties.<br />

Natural inanities.<br />

Any other circumstances which are beyond human control.<br />

3.27. In case bulk bitumen <strong>issued</strong> to the agency, no extra cost will be paid on account <strong>of</strong> lifting bulk<br />

bitumen in departmental, empty bitumen drums and carriage <strong>of</strong> the same from the R.C.D.<br />

godown to the site <strong>of</strong> work and these operation will have to be carried out at the own cost <strong>of</strong> the<br />

agency.<br />

3.28. Extension <strong>of</strong> time, if justified may be granted <strong>by</strong> the <strong>of</strong>ficer for different periods <strong>of</strong> time for<br />

different types & values <strong>of</strong> woks, otherwise penalty for non fulfillment <strong>of</strong> the contract may be<br />

imposed giving due consideration for poor progress at different stages <strong>of</strong> works without valid<br />

and satisfactory reasons. More payments <strong>of</strong> running on accounts bills keeping back certain<br />

amount for non extension <strong>of</strong> time as a does not qualify as a valid ground for grant <strong>of</strong> extension<br />

<strong>of</strong> time as a matter <strong>of</strong> right. The <strong>of</strong>ficer competent to grant such extension <strong>of</strong> time has the full<br />

liberty to wait & examine the circumstances which lead to the applicable for the fulfillment <strong>of</strong><br />

the contract and use his own discretion for final order which will be final, binding & conclusive<br />

in the contractor.<br />

3.29. The contractor shall if required <strong>by</strong> the E/I arrange to test the materials at site or get them tested<br />

in recognized departmental testing laboratories at his own cost in order to prove their soundness<br />

and sufficiency as per specification lay down. The number <strong>of</strong> tests required for different items<br />

will be specified <strong>by</strong> E/I.<br />

3.30. The estimated output <strong>of</strong> roller for 8 hours working is as follows:-<br />

Compaction <strong>of</strong> Gravel/Moorum 255 m 3 /day<br />

Compaction <strong>of</strong> earth work 566 m 3 /day<br />

Consolidation <strong>of</strong> Grade-I 35 m 3 /day<br />

Consolidation <strong>of</strong> Grade-II 30 m 3 /day<br />

Consolidation <strong>of</strong> Grade-III 30 m 3 /day<br />

20 mm thick premixing 740 m 2 /day<br />

Surface dressing 770 m 2 /day<br />

3.31. The contractor shall make his own efficient arrangement to receive communication <strong>of</strong> the<br />

department. In case this rate complied with a pro<strong>of</strong> dispatch <strong>of</strong> any communication shall be<br />

deemed to have been served on him.