Sl. Name <strong>of</strong> Work Quantity Unit Rate Amount<br />

5 Providing 50mm (av.) leveling course <strong>of</strong> thickness varying<br />

from 25mm to 75mm consisting <strong>of</strong> lean bituminous<br />

macadam in proper grade camber or super elevation with<br />

stone aggregate <strong>of</strong> 40mm, 20mm & 10mm size in ratio <strong>of</strong><br />

(7:9:4) @ 0.67m³ surface & bitumen @ 43 Kg. m³ <strong>of</strong> stone<br />

aggregate for premixing & tack coat @ 5 Kg. all per 10m²<br />

surface including cost <strong>of</strong> cleaning the surface properly with<br />

iron brush and broom cost <strong>of</strong> heating the bitumen to<br />

required temperature with coat <strong>of</strong> fuel, rolling providing<br />

light barrier danger signals chowkidar returning the empty<br />

drums in good condition to the godown & hire charges <strong>of</strong><br />

<strong>road</strong> roller without depreciation & major repair as per<br />

specification & direction <strong>of</strong> E/I.<br />

188.490 Per m² 224.96 42403.00<br />

6 Providing 20mm thick open graded premix carpet over B.T<br />

surface (old surface) in proper grade camber or super<br />

elevation with stone chips <strong>of</strong> 12mm to 10mm size in ratio <strong>of</strong><br />

(2:1) @ 0.27 m³ & bitumen @ 19.6 Kg including tack coat<br />

@ 5 Kg all per 10m² surface including cost <strong>of</strong> cleaning the<br />

surface properly with iron brush and broom cost <strong>of</strong> heating<br />

the bitumen to required temperature with coat <strong>of</strong> fuel,<br />

rolling providing light barrier danger signals chowkidar<br />

returning the empty drums in good condition to the godown<br />

& hire charges <strong>of</strong> <strong>road</strong> roller without depreciation & major<br />

repair as per specification & direction <strong>of</strong> E/I.<br />

3769.80 Per m² 123.74 466475.00<br />

7 Earth work in <strong>road</strong> embankment and shoulders with<br />

ordinary soil (vide classification <strong>of</strong> soil item-A) obtained<br />

from borrow pits or any other sources free from logs,<br />

stumps, roots, rubbish or any other ingredients likely to<br />

deteriorate or affect the stability <strong>of</strong> the embankment<br />

including the breaking the clods maximum to 60 mm cube,<br />

placing the earth in layers not exceeding 225 mm in loose<br />

thickness rough dressing including the cost <strong>of</strong> cutting and<br />

removing shrubs and roots falling in borrow area with<br />

initial laed <strong>of</strong> 15M and lift <strong>of</strong> 1.5M all complete job as per<br />

approved design, specification and direction <strong>of</strong> E/I. (Mode<br />

<strong>of</strong> measurement - sectional measurement after required<br />

compaction). 292.30 Per m³ 52.25 15273.00<br />

8 Rolling and compacting <strong>of</strong> <strong>road</strong> embankment in all kinds <strong>of</strong><br />

soil including hard and gravely soil, soil mixed with<br />

boulders <strong>by</strong> <strong>road</strong> roller in layer not exceeding 225 mm in<br />

loose thickness so as in achieve 90 to 95% MDD at OMC<br />

uniformly including mixing the required quantity <strong>of</strong> water<br />

including cost <strong>of</strong> supply and carriage <strong>of</strong> water all lead and<br />

lifts, finishing the surface to proper grade camber or super<br />

elevation including cost <strong>of</strong> hire charge <strong>of</strong> <strong>road</strong> roller with<br />

depreciation and major repair, providing light, barrier,<br />

danger signal, chowkidar all complete as per specification<br />

and direction <strong>of</strong> E/I. 292.30 Per m³ 11.12 3250.00<br />

900000.00<br />

Executive Engineer<br />

R.C.D. Road Div. Latehar