3.23. The following shall not be paid extra and the <strong>tender</strong>ed rates shall be inclusive <strong>of</strong> these:-<br />

∗ Site clearance such as clearing <strong>of</strong> shrubs bush wood under growth and small trees not<br />

exceeding 254mm to 305mm in girth measured at height <strong>of</strong> 900mm above ground.<br />

∗ Setting out work pr<strong>of</strong>ile layout etc.<br />

∗ Unauthorized battering or benching or excavation <strong>of</strong> foundation trenchers.<br />

∗ Forming <strong>of</strong> laying Tell-Tele or witness in borrows pits and their removal after<br />

measurement However, deduction will be made in quantity <strong>of</strong> each work for these.<br />

∗ Excavation for inserting <strong>of</strong> planking and shuttering.<br />

∗ Forming (or leaving)step in sides <strong>of</strong> deep excavation and their removal after<br />

∗ Bailing out rain water and surface water along with consequential desalting in the case<br />

the excavated foundation trenches were filled upto these during entire period <strong>of</strong><br />

contraction.<br />

∗ Removing slips on falls in extenuation<br />

∗ Fraction and/or establishing Yard site Store site <strong>of</strong>fice etc.<br />

∗ Making vats mixing platform watering channel etc.<br />

3.24. The contractor may use his own machinery for the completion <strong>of</strong> work within the time<br />

stipulated in the contract the carriage <strong>of</strong> machinery to different sites under this contract from one<br />

place to another for this work will be the responsibility <strong>of</strong> the contractor and all expenses in this<br />

regard will be born <strong>by</strong> him.<br />

3.25. Other machinery like asphalt mixer, tar boiler, pump vibrator, concrete mixer etc. if available in<br />

the stores <strong>of</strong> the concern division may be <strong>issued</strong> to the contractor on his written requisition hire<br />

or free <strong>of</strong> cost as the case may be on the terms quoted in his <strong>tender</strong> covers. This hire charges, if<br />

applicable along with its called expense as detailed below in sub paras 3.26.1 to 3.26.10 which<br />

are to be <strong>by</strong> the departmental machinery, the condition laid down in sub paras 3.26.1 to 3.26.10<br />

will apply into departmental <strong>road</strong> roller <strong>issued</strong> to contractor.<br />

3.25.1. Hire charges <strong>of</strong> <strong>road</strong> roller has been indicated in para 1.15 <strong>of</strong> NIT. Hire charges <strong>of</strong> other<br />

machineries will be communicated on and the same shall have to be accepted <strong>by</strong> the<br />

contractors.<br />

3.25.2. Carriage and running charges <strong>of</strong> machineries if any including on incidental and<br />

contingent charges for transporting the same from place <strong>of</strong> delivery to the work site<br />

and their return to the place <strong>of</strong> issue shall be borne <strong>by</strong> the contractor on his own cost.<br />

3.25.3. Salary <strong>of</strong> roller driver, khalasi, operator <strong>of</strong> other machineries will be borne <strong>by</strong> the<br />

contractor. The period spent in its transport from place <strong>of</strong> issue to work site and back<br />

shall also be for their purpose, it will be responsibility <strong>of</strong> the contractor to obtain<br />

necessary information regarding salary <strong>of</strong> the departmental staff.<br />

3.25.4. The cost <strong>of</strong> fuel and lubricants for running the machinery will be borne <strong>by</strong> the<br />

contractor.<br />

3.25.5. The plants and machineries <strong>issued</strong> on hire or free <strong>of</strong> cost to the contractor the department<br />

will have to be maintained properly daily in addition to its general daily maintenance<br />

and in case <strong>of</strong> roller it shall also cleaned in a week & stores required for cleaning i.e.<br />

Kerosene oil, soap, jute, grease, Mobil, etc. will have to be supplied <strong>by</strong> the contractor<br />

at his own cost. Mobil oil will have to change after 200 (Two hundred) <strong>of</strong> running<br />

hours, C. oil shall be changed after 1000 (One thousand) <strong>of</strong> running hour at his own<br />

cost. The quality <strong>of</strong> all the materials supplied <strong>by</strong> the contractor will have to be<br />

approved <strong>by</strong> the E/I before use.<br />

3.25.6. During the operator period the machinery is on work with the contractor all minor<br />

repairs or break down costing up to Rs. 100/- at a time will be responsibility <strong>of</strong> the<br />

contractor and such be completed within maximum period <strong>of</strong> 3 days under intimation<br />

to concerned J.E, SDO, EE.<br />

3.25.7. In case the contractor fails to supply the required fuel, lubricants & other stores required<br />

for running and proper maintenance <strong>of</strong> departmental machineries & proper or free <strong>of</strong><br />

cost to the contractor for using the same shall be supplied <strong>by</strong> the department, its full