Bill <strong>of</strong> Quantity for Ordinary Repair in Km. 10, 14 & 18 <strong>of</strong> Bhushar kechki Barwadih Bhandaria<br />

Godarmana Road for the year 2011-12<br />

1. Estimated Cost- 8,09,996.00 2. Cost <strong>of</strong> BOQ- 1250.00<br />

3. Earnest Money- 16,200.00 4. Time <strong>of</strong> Completion- 2 Month<br />

Sl. Name <strong>of</strong> Work Quantity Unit Rate Amount<br />

1 2 3 4 5 6<br />

1 Providing 25mm av. thick patch repair consisting <strong>of</strong> lean bituminous<br />

macadam in proper grade camber or super elevation with stone<br />

chips <strong>of</strong> 12mm & 10mm size in ratio (2:1) @ 0.33 m³ & bitumen @<br />

25 Kg including requirement <strong>of</strong> tack coat both per 10 m² including<br />

cost <strong>of</strong> heating the aggregate and bitumen to required temperature<br />

with cost <strong>of</strong> fuel, cleaning the surface properly with iron brush and<br />

broom, rolling providing light barrier danger signals chowkidar<br />

carriage <strong>of</strong> bitumen drums upto 8.0 Km. lead from godown to work<br />

site and returning the empty drum in good condition to the godown<br />

& hire charges <strong>of</strong> <strong>road</strong> roller without depreciation & major repair as<br />

per specification & direction <strong>of</strong> E/I. 2610.170 Per m 2 161.89 422560.00<br />

2 Providing 20mm thick open graded premix carpet over B.T surface<br />

(old surface) in proper grade camber or super elevation with stone<br />

chips <strong>of</strong> 12mm to 10mm size in ratio <strong>of</strong> (2:1) @ 0.27 m³ & bitumen<br />

@ 19.6 Kg including tack coat @ 5 Kg all per 10m² surface<br />

including cost <strong>of</strong> cleaning the surface properly with iron brush and<br />

broom cost <strong>of</strong> heating the bitumen to required temperature with coat<br />

<strong>of</strong> fuel, rolling providing light barrier danger signals chowkidar<br />

returning the empty drums in good condition to the godown & hire<br />

charges <strong>of</strong> <strong>road</strong> roller without depreciation & major repair as per<br />

specification & direction <strong>of</strong> E/I. 2801.650 Per m 2 126.25 353708.00<br />

3 Earth work in <strong>road</strong> embankment and shoulders with ordinary soil<br />

(vide classification <strong>of</strong> soil item-A) obtained from borrow pits or any<br />

other sources free from logs, stumps, roots, rubbish or any other<br />

ingredients likely to deteriorate or affect the stability <strong>of</strong> the<br />

embankment including the breaking the clods maximum to 60 mm<br />

cube, placing the earth in layers not exceeding 225 mm in loose<br />

thickness rough dressing including the cost <strong>of</strong> cutting and removing<br />

shrubs and roots falling in borrow area with initial lead <strong>of</strong> 15M and<br />

lift <strong>of</strong> 1.5M all complete job as per approved design, specification<br />

and direction <strong>of</strong> E/I. (Mode <strong>of</strong> measurement - sectional measurement<br />

after required compaction). 532.250 Per m 3 52.25 27810.00<br />

4 Rolling and compacting <strong>of</strong> <strong>road</strong> embankment in all kinds <strong>of</strong> soil<br />

including hard and gravely soil, soil mixed with boulders <strong>by</strong> <strong>road</strong><br />

roller in layer not exceeding 225 mm in loose thickness so as in<br />

achieve 90 to 95% MDD at OMC uniformly including mixing the<br />

required quantity <strong>of</strong> water including cost <strong>of</strong> supply and carriage <strong>of</strong><br />

water all lead and lifts, finishing the surface to proper grade camber<br />

or super elevation including cost <strong>of</strong> hire charge <strong>of</strong> <strong>road</strong> roller with<br />

depreciation and major repair, providing light, barrier, danger signal,<br />

chowkidar all complete as per specification and direction <strong>of</strong> E/I. 532.250 Per m 3 11.12 5918.00<br />

Total- 809996.00<br />