1.3.3 Duly pledged E.M. if any lying with the concerned E.M. against work already completed shall<br />

not be adjusted <strong>by</strong> transfer. In such cases the <strong>tender</strong>er is required to get the same refunded and<br />

then attach the same with <strong>tender</strong> duly pledged a fresh against the work for which <strong>tender</strong> is filed.<br />

1.4 DOCUMENTS ACCOMPANYING TENDER PAPER<br />

1.4.1 Under noted documents (certified photo copies) must be enclosed with the <strong>tender</strong> paper.<br />

∗ All these documents required at the time <strong>of</strong> purchasing <strong>tender</strong> documents.<br />

∗ Description <strong>of</strong> machineries owned <strong>by</strong> the <strong>tender</strong> in the Performa place at appendix-1 <strong>of</strong> the<br />

<strong>tender</strong> documents along with sale letter <strong>of</strong> the manufacturer.<br />

∗ An affidavit swearing that the Machinery statement at Appendix-I is true.<br />

∗ The documents required specifically for the work as enumerated in Para 1.8 below # .<br />

∗ In case <strong>of</strong> <strong>tender</strong>er being a firm the deed <strong>of</strong> the firm & the power <strong>of</strong> attorney if any.<br />

∗ In case the <strong>tender</strong> documents downloaded from the website <strong>of</strong> Jharkhand government<br />

www.jharkhand.gov.in cost <strong>of</strong> <strong>tender</strong> document in form <strong>of</strong> Bank Draft payable to Executive<br />

Engineer, R.C.D. Road Division Latehar, in State bank <strong>of</strong> India, Latehar.<br />

1.4.2 Tenders with incomplete documents shall outright be rejected.<br />

1.5 OWNERSHIP OF MACHINERIES.<br />

1.5.1 Tenders who do not own/hire machineries confirming to relevant BIS or IRC standard required<br />

for the work as notified in NIT should not purchase the <strong>tender</strong> document for that at work in case<br />

the <strong>tender</strong> are submitted the work they will be summarily rejected <strong>of</strong> the <strong>tender</strong>er do not<br />

produce the ownership <strong>of</strong> required machineries.<br />

1.5.2 For bituminous work requiring use <strong>of</strong> hot mix plants specifications as laid down in I.S 5890-<br />

1970 only will be accepted.<br />

1.6 QUOTING RATE TIME.<br />

1.6.1 Tenderer should quote their rate only at the space earmarked in the document in percentage,<br />

above or below the items mentioned in B.O.Q. (on overall not item wise) both in figures and<br />

words.<br />

1.6.2 The quoted rates.<br />

∗ Must not have anomaly in figure and words.<br />

∗ Must be initialed to there is cutting or overwriting<br />

∗ Must not be indefinite such as at estimated rates or at………% above/below inclusive <strong>of</strong><br />

material etc.<br />

∗ Failing which the <strong>of</strong>fer with invalided.<br />

1.6.3 In case among <strong>of</strong> <strong>of</strong>fer on overall rate quoted <strong>by</strong> a <strong>tender</strong>ed is lower than15% the <strong>of</strong>fer will be<br />

treated as unworkable and will invalidate the <strong>of</strong>fer.<br />

1.6.4 B.O.Q. also provides information <strong>of</strong> the cut <strong>of</strong>f percentage (calculated on the basis <strong>of</strong>…) above<br />

which <strong>tender</strong>s will be invalid.<br />

1.6.5 The quoted rate shall be deemed to include 2% sales tax and 1% labor surcharge.<br />

1.6.6 Time allowed to complete the work should be carefully scrutinized <strong>by</strong> the <strong>tender</strong>er and in case<br />

the notified time <strong>of</strong> completion is not suited the <strong>tender</strong>er may quote his own time.<br />

1.7 WORK DISCIPLINE<br />

1.7.1 Only MORTH/LS/IRC specifications shall be followed during execution <strong>of</strong> work.<br />

1.7.2 Site order book will have to be maintained at site.<br />

1.7.3 Works and Account codes & Financial Rules <strong>of</strong> Govt. <strong>of</strong> Jharkhand along with guidance from<br />

T.E.C. & Ministry <strong>of</strong> Road Transport & Highways shall be concurrently applicable in the entire<br />

processes leading to final completion <strong>of</strong> work.<br />

1.8 ADDITIONAL DOCUMENTS TO ACCOMPANY TENDER PAPER.<br />

1.8.1 Documents required to accompany the <strong>tender</strong> are enumerated in Para 1.4.1 However the<br />

following additional documents must accompany the <strong>tender</strong> paper as referred in Para 1.4.1<br />

marked #.<br />

∗ A certificate <strong>of</strong> competent authority showing similar nature <strong>of</strong> work executed <strong>by</strong> the <strong>tender</strong>.<br />

∗ A list <strong>of</strong> work in the hands <strong>of</strong> Tenderer containing information in appendix-II accompanying<br />

the <strong>tender</strong> document.