4.3.5 FABRICATION OF PLATFORMS / BRACINGS/ G.I.GRATINGS:<br />
4.3.5.1 Fabrication <strong>of</strong> bracings, built up sections, platforms, handrails, stairways and<br />
ladders from rolled steel section, plates, flats, pipes etc, as per <strong>drawings</strong> and<br />
specifications. The fabricated structures shall be given primer, intermediate<br />
and finish paints including surface preparation as per painting specifications.<br />
4.3.5.2 The Contractor shall make a detailed study at site the extent <strong>of</strong> Bracings,<br />
platforms at different elevations (connected with Convection Section, Stack),<br />
and are required to be cut out / dismantle to free the Convection Section /<br />
stack dismantling. The contractor shall newly fabricate these Plat forms,<br />
hand railings and Bracings etc.<br />
4.3.5.3 The connected Ladders/Stairs at different elevations shall be fabricated. All<br />
the platforms shall be fabricated to the maximum size modules with hand<br />
railings etc. and transported to site, keeping in view the constraints at site for<br />
erection.<br />
4.3.5.4 GRATINGS<br />
Procurement, fabrication and erection <strong>of</strong> hot dip galvanized gratings along<br />
with GI support clamps as per EIL standards no:7-68-0581 Rev.2 (Type II)<br />
4.4 DISMANTLING AND ERECTION:<br />
4.4.1 Dismantling works:<br />
4.4.1.1. Dismantling <strong>of</strong> existing stacks in single / two pieces. The existing stack<br />
shall be dismantled and placed on the ground. If required the same is to be<br />
cut in to 3 or 4 pieces and the same are to be transported to HPCL storage<br />
area and un-loaded as directed by HPCL engineer-in-charge. In the event<br />
<strong>of</strong> delay <strong>of</strong> new stack dampers, the clause on 4.3.3.1 to be followed.<br />
4.4.1.2 Dismantling <strong>of</strong> the existing Convection Section .The existing Convection<br />
Section shall be dismantled and placed on ground. If required the same is<br />
to be cut in to 3 or 4 pieces as directed by the Engineer-in-charge. The<br />
Existing Convection Section shall be transported to HPCL storage area and<br />
unloaded as directed by Engineer-in-charge. Chipping <strong>of</strong> refractories inside<br />
heaters to expose the metal for facilitating the cutting operation to be<br />
carried out. Good engineering practices to be followed for scaffolding,<br />
welding, dismantling and lowering <strong>of</strong> equipments / piping / stacks.<br />
4.4.1.3 Dismantling <strong>of</strong> Associated Platforms / Bracings / Piping work / ducting:<br />
Dismantling <strong>of</strong> structural platforms, staircase and ladders etc. connected to<br />
equipments is a part <strong>of</strong> scope and to be segregated items wise as per the<br />
directions <strong>of</strong> the job engineer.<br />
4.4.1.4 Dismantling includes cutting <strong>of</strong> the steel work/ removal <strong>of</strong> bolts/ nuts/cut out<br />
<strong>of</strong> welds, cut out <strong>of</strong> portion <strong>of</strong> refractory at joints, as may be necessary.<br />
Every care shall be taken to limit the dismantling up to the exact point and<br />
/or lines as directed by the Engineer-in- charge and any damage caused to