4.3.5 FABRICATION OF PLATFORMS / BRACINGS/ G.I.GRATINGS:<br />

4.3.5.1 Fabrication <strong>of</strong> bracings, built up sections, platforms, handrails, stairways and<br />

ladders from rolled steel section, plates, flats, pipes etc, as per <strong>drawings</strong> and<br />

specifications. The fabricated structures shall be given primer, intermediate<br />

and finish paints including surface preparation as per painting specifications.<br />

4.3.5.2 The Contractor shall make a detailed study at site the extent <strong>of</strong> Bracings,<br />

platforms at different elevations (connected with Convection Section, Stack),<br />

and are required to be cut out / dismantle to free the Convection Section /<br />

stack dismantling. The contractor shall newly fabricate these Plat forms,<br />

hand railings and Bracings etc.<br />

4.3.5.3 The connected Ladders/Stairs at different elevations shall be fabricated. All<br />

the platforms shall be fabricated to the maximum size modules with hand<br />

railings etc. and transported to site, keeping in view the constraints at site for<br />

erection.<br />

4.3.5.4 GRATINGS<br />

Procurement, fabrication and erection <strong>of</strong> hot dip galvanized gratings along<br />

with GI support clamps as per EIL standards no:7-68-0581 Rev.2 (Type II)<br />

4.4 DISMANTLING AND ERECTION:<br />

4.4.1 Dismantling works:<br />

4.4.1.1. Dismantling <strong>of</strong> existing stacks in single / two pieces. The existing stack<br />

shall be dismantled and placed on the ground. If required the same is to be<br />

cut in to 3 or 4 pieces and the same are to be transported to HPCL storage<br />

area and un-loaded as directed by HPCL engineer-in-charge. In the event<br />

<strong>of</strong> delay <strong>of</strong> new stack dampers, the clause on 4.3.3.1 to be followed.<br />

4.4.1.2 Dismantling <strong>of</strong> the existing Convection Section .The existing Convection<br />

Section shall be dismantled and placed on ground. If required the same is<br />

to be cut in to 3 or 4 pieces as directed by the Engineer-in-charge. The<br />

Existing Convection Section shall be transported to HPCL storage area and<br />

unloaded as directed by Engineer-in-charge. Chipping <strong>of</strong> refractories inside<br />

heaters to expose the metal for facilitating the cutting operation to be<br />

carried out. Good engineering practices to be followed for scaffolding,<br />

welding, dismantling and lowering <strong>of</strong> equipments / piping / stacks.<br />

4.4.1.3 Dismantling <strong>of</strong> Associated Platforms / Bracings / Piping work / ducting:<br />

Dismantling <strong>of</strong> structural platforms, staircase and ladders etc. connected to<br />

equipments is a part <strong>of</strong> scope and to be segregated items wise as per the<br />

directions <strong>of</strong> the job engineer.<br />

4.4.1.4 Dismantling includes cutting <strong>of</strong> the steel work/ removal <strong>of</strong> bolts/ nuts/cut out<br />

<strong>of</strong> welds, cut out <strong>of</strong> portion <strong>of</strong> refractory at joints, as may be necessary.<br />

Every care shall be taken to limit the dismantling up to the exact point and<br />

/or lines as directed by the Engineer-in- charge and any damage caused to