24.08.2013 Views

Manual tehnic automate cafea Saeco Group 200

Manual tehnic automate cafea Saeco Group 200

Manual tehnic automate cafea Saeco Group 200

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

72 Payment system installation<br />

on the base cabinet<br />

The base cabinet has no payment system The<br />

responsibility for possible damages to the<br />

machine and other objects and for personal<br />

injuries caused by an incorrect installation of the<br />

payment system falls on the person who installed<br />

the system<br />

- remove or turn the coiner supporting plate<br />

(fig38, ref1)<br />

- hook and secure the coiner to the support<br />

(fig38, ref2)<br />

- reassemble and lock the support to the<br />

cabinet door (fig38, ref3)<br />

fig38<br />

fig38, rif1 fig38, rif2<br />

fig38, rif3<br />

- connect the coiner to the CPU card<br />

English<br />

NOTE: Executive, MDB and BDV serial systems<br />

are connected to the CPU card using a cable<br />

and an interface in necessary, both included in<br />

the special kit<br />

- Then enter the programming menu so as to<br />

choose convenient settings<br />

See section 8 ‘PROGRAMMING AND<br />

MAINTENANCE MENU’ in order to check<br />

parameter setting, which should be in line with<br />

the system used<br />

25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!