SAP-BIO-Lebanon National Report Page 12 <strong>of</strong> 95<br />

¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯<br />

Search <strong>of</strong> <strong>the</strong> available in<strong>for</strong>mation and databases on national biodiversity as well as scientific<br />

publications on coastal terrestrial and aquatic species were reviewed and consolidated <strong>for</strong> easier access<br />

and use (please refer to list <strong>of</strong> tables and annexes).<br />

3. Documents and in<strong>for</strong>mation available in <strong>the</strong> country<br />

An exhaustive literature review covering research undertaken on <strong>the</strong> Lebanese coastal and aquatic<br />

environments has been compiled in Appendix I. Due to <strong>the</strong> absence <strong>of</strong> national database, <strong>the</strong> list might<br />

not include all published material on coastal and aquatic biodiversity.<br />

4. Relevant activities that have been implemented at <strong>the</strong> national level<br />

After <strong>the</strong> civil war, <strong>the</strong> country <strong>of</strong> Lebanon was in dire need to address <strong>the</strong> ravages that befell its<br />

environment. Within this context and with <strong>the</strong> initiatives undertaken by <strong>the</strong> MoE, <strong>the</strong> country was able to<br />

secure several projects from international funding agencies in order to begin <strong>the</strong> remedy process and to<br />

save what remains <strong>of</strong> <strong>the</strong> Lebanese natural environment. The tendency was to address, first and <strong>for</strong>emost,<br />

issues related to pollution. In parallel, ef<strong>for</strong>ts were started in <strong>the</strong> field <strong>of</strong> biodiversity, and <strong>the</strong> collection<br />

and indexing <strong>of</strong> organisms is being carried-out, albeit slowly and with some difficulty due to <strong>the</strong> absence<br />

<strong>of</strong> taxonomists and <strong>the</strong> necessary resources. Never<strong>the</strong>less, several activities have taken place or are<br />

ingoing, <strong>the</strong>re<strong>for</strong>e increasing <strong>the</strong> knowledge base <strong>of</strong> <strong>the</strong> scientific community.<br />

4.1 Biodiversity Enabling Activity (Phase I)<br />

This project was executed in 1998 by <strong>the</strong> MoE with <strong>the</strong> support <strong>of</strong> UNDP/GEF. The main outcome <strong>of</strong> this<br />

project is <strong>the</strong> National Biodiversity Startegy and <strong>Action</strong> <strong>Plan</strong> that was prepared in order to fulfill <strong>the</strong><br />

requirements <strong>of</strong> article 6 <strong>of</strong> <strong>the</strong> CBD.<br />

4.2 Biodiversity Enabling Activity (Phase II)<br />

The MoE benefited from an additional funding from <strong>the</strong> GEF to execute this project which aims at<br />

assisting <strong>the</strong> MoE to fur<strong>the</strong>r assess national capacity building needs and priorities, analyze institutional<br />

and functional capabilities and determine <strong>the</strong> necessary mechanisms to protect national biodiversity<br />

(MoE/UNDP/GEF, April 2002-February 2003).<br />

4.3 <strong>Project</strong> <strong>for</strong> Streng<strong>the</strong>ning <strong>the</strong> Permitting and Auditing System <strong>for</strong> Industries (February<br />

2000 –May 2002, SPASI, EU/MOE)<br />

Main outputs <strong>of</strong> this project include <strong>the</strong> development <strong>of</strong> decrees and regulations aimed at streng<strong>the</strong>ning<br />

<strong>the</strong> permitting and auditing system <strong>for</strong> industry as well as <strong>the</strong> <strong>for</strong>mulation <strong>of</strong> appropriate standards.<br />

The project has established National Standards <strong>for</strong> environmental quality <strong>for</strong> stack emissions and<br />

wastewater (discharge to <strong>the</strong> sea, surface water, sewer network). These standards have been issued by<br />

MOE (#8/1, 2001) and will be introduced on a trial basis be<strong>for</strong>e being submitted to become a decree.<br />

4.4 Environmental Impact Assessment Unit (1997-2002, World Bank/MOE)<br />

The role <strong>of</strong> this unit is to prepare executive decrees <strong>for</strong> assessing <strong>the</strong> environmental impacts <strong>of</strong> proposed<br />

projects.<br />

The unit has worked at three levels, namely legal, institutional and capacity building. At <strong>the</strong> legal level it<br />

has prepared draft decrees that will be submitted to <strong>the</strong> council <strong>of</strong> Ministers <strong>for</strong> action. At <strong>the</strong> institutional<br />

___________________________________________________________________________________________<br />

Prepared By M. Nader & S. Talhouk June, 2002