Updated: March 6, 2012 <strong>Gaston</strong>ia, NC 28054<br />

2. Three (3) original copies (Architect, Contractor, GCS), plus as many others for<br />

the contractor as they would like<br />

3. Signature of Contractor<br />

4. Signature Block for L. Reeves McGlohon, Superintendent<br />

5. Signature Block for Mary Jo Lindquist, Finance Officer, with the following<br />

phrase printed above her signature: "This instrument has been preaudited in<br />

the manner required by the School Budget <strong>and</strong> Fiscal Control Act."<br />

6. After all signatures are obtained, mail contract to the entities noted above.<br />

7. Make one (1) copy of the GCS copy for Finance - Mary Jo Lindquist.<br />

8. File the Contract Control Sheet with the GCS Project Management copy of the<br />

contract<br />

C. Close out<br />

1. Project Close-Out – Add language to all contracts: All project close-out<br />

documentation shall be submitted to the architect within 90 days after<br />

substantial completion. Failure to comply will be grounds for bid exclusion on<br />

all future <strong>Gaston</strong> <strong>County</strong> <strong>Schools</strong> projects until close-out documentation<br />

submittal. Final payment of remaining retainage will not be made until all<br />

closeout documentation is received <strong>and</strong> approved.<br />

2. As-Built<br />

a) Record Drawings<br />

b) Latest version AutoCAD <strong>and</strong> paper drawings by architect<br />

c) Contractor & Owner red-lines due with Architectural As-Builts<br />

d) If project is combined (more than one location), separate as-built<br />

drawings, O&M Manuals for each location is required<br />

e) The design professional shall update the electronic CAD files with the<br />

information <strong>and</strong> changes described on the contractor’s As-Built files.<br />

The updated CAD files shall be compiled onto a common electronic<br />

media device, such as a CD-ROM or USB Memory Stick, <strong>and</strong> turned<br />

over to GCS as part of the close out documents<br />

3. Turn-over Documents Required<br />

a) AIA G702 - Final Application for Payment<br />

b) AIA G707 - Consent of Surety to Final Payment<br />

c) AIA G706 - Contractor's Affidavit of Payment of Debts <strong>and</strong> Claims<br />

d) AIA G706A - Contractor's Affidavit of Release of Liens<br />

e) Operation <strong>and</strong> Maintenance Manuals – Minimum of two (2) copies<br />

required.<br />

f) Control Drawings <strong>and</strong> Manuals Manuals – Minimum of two (2) copies<br />

required.<br />

g) Asbestos Letter – States that no asbestos was used.<br />

h) As-Built Drawings – To be used by Engineer to update contract<br />

documents<br />

i) HVAC System Certification – Certifies that all work is installed per code<br />

<strong>and</strong> per contract.<br />

j) Mechanical Guarantee Letter – States dates of Warrantee<br />

k) Copy of Local Inspection Report<br />

l) Copy of Certificate of Occupancy<br />

*=Preferred Br<strong>and</strong>; Bid Alternate Required Page 2 of 38 Pages