23.10.2013 Views

Design and Specification Guidelines - Gaston County Schools

Design and Specification Guidelines - Gaston County Schools

Design and Specification Guidelines - Gaston County Schools

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Design</strong> <strong>and</strong> <strong>Specification</strong> <strong>Guidelines</strong> <strong>Gaston</strong> <strong>County</strong> <strong>Schools</strong><br />

Updated: March 6, 2012 <strong>Gaston</strong>ia, NC 28054<br />

2. Need to make it easy to check for Exhaust Fan operation Filter Changer<br />

checks three (3) times/year<br />

3. Exhaust fans to be controlled by BAS, excluding server rooms<br />

4. Single restroom exhaust fans controlled by light switch<br />

O. DX Ductless Mini-Split Air Conditioning Units<br />

1. Computer labs <strong>and</strong> data closets shall be operating on separate DX ductless<br />

mini-split air conditioning system, <strong>and</strong> shall have sufficient airflow to keep the<br />

room below 85 degrees Fahrenheit. Estimated load is 12,000 BTUH.<br />

P. Chemical Feed<br />

1. Install five (5) gallon chemical feed pot for each hydraulic system<br />

Q. Controls – Facility Controls <strong>and</strong> BAS<br />

1. Energy Management Bid as Alternate<br />

a) Br<strong>and</strong>s (Controls)<br />

(1) Trane<br />

(2) Alerton (Native BACnet/IP)<br />

(3) Honeywell<br />

(4) Invensys<br />

b) No 3 rd Party Controllers on Roof Top Unit’s, Air H<strong>and</strong>ling Unit’s; No<br />

pump packages; Boiler <strong>and</strong> Chiller to be provided with BACnet/IP or<br />

LON Communications<br />

c) Features<br />

(1) Must comply with current GCS BAS St<strong>and</strong>ards <strong>and</strong> include<br />

upgrades to latest AX BAJA Version<br />

(2) Want ability to set limits from control system; monitor & control;<br />

global, zone, <strong>and</strong> individual; trend, diagnose, <strong>and</strong> compare energy<br />

usage/ operational times/ “exception scheduling”; archive, backup,<br />

<strong>and</strong> retrieve data for 3-year periods; control <strong>and</strong> monitor space<br />

temp, supply temp return air temp, outside air temp, mixed air<br />

temp, energy wheel contribution temp, relative humidity<br />

(OA/ST/SA/RA), enthalpy, carbon dioxide, et al.<br />

(3) Operating Parameters (pending) – contact GCS Energy<br />

Manager<br />

d) Training Included:<br />

(1) Forty (40) hours in four (4) hour blocks<br />

(a) Hours <strong>and</strong> blocks to be determined by GCS on individual<br />

project basis<br />

(2) Unlimited Attendance<br />

(3) Owner may choose to videotape training.<br />

2. Non-BAS Controls Used<br />

a) Thermostats<br />

(1) Programmable – BACNET or LON programmable features<br />

(2) Battery Back up<br />

(3) Place on return air grill wall<br />

(4) For st<strong>and</strong>alone T’Stats, want physical stops<br />

*=Preferred Br<strong>and</strong>; Bid Alternate Required Page 25 of 38 Pages

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!