Design and Specification Guidelines - Gaston County Schools
Design and Specification Guidelines - Gaston County Schools
Design and Specification Guidelines - Gaston County Schools
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Design</strong> <strong>and</strong> <strong>Specification</strong> <strong>Guidelines</strong> <strong>Gaston</strong> <strong>County</strong> <strong>Schools</strong><br />
Updated: March 6, 2012 <strong>Gaston</strong>ia, NC 28054<br />
2. Need to make it easy to check for Exhaust Fan operation Filter Changer<br />
checks three (3) times/year<br />
3. Exhaust fans to be controlled by BAS, excluding server rooms<br />
4. Single restroom exhaust fans controlled by light switch<br />
O. DX Ductless Mini-Split Air Conditioning Units<br />
1. Computer labs <strong>and</strong> data closets shall be operating on separate DX ductless<br />
mini-split air conditioning system, <strong>and</strong> shall have sufficient airflow to keep the<br />
room below 85 degrees Fahrenheit. Estimated load is 12,000 BTUH.<br />
P. Chemical Feed<br />
1. Install five (5) gallon chemical feed pot for each hydraulic system<br />
Q. Controls – Facility Controls <strong>and</strong> BAS<br />
1. Energy Management Bid as Alternate<br />
a) Br<strong>and</strong>s (Controls)<br />
(1) Trane<br />
(2) Alerton (Native BACnet/IP)<br />
(3) Honeywell<br />
(4) Invensys<br />
b) No 3 rd Party Controllers on Roof Top Unit’s, Air H<strong>and</strong>ling Unit’s; No<br />
pump packages; Boiler <strong>and</strong> Chiller to be provided with BACnet/IP or<br />
LON Communications<br />
c) Features<br />
(1) Must comply with current GCS BAS St<strong>and</strong>ards <strong>and</strong> include<br />
upgrades to latest AX BAJA Version<br />
(2) Want ability to set limits from control system; monitor & control;<br />
global, zone, <strong>and</strong> individual; trend, diagnose, <strong>and</strong> compare energy<br />
usage/ operational times/ “exception scheduling”; archive, backup,<br />
<strong>and</strong> retrieve data for 3-year periods; control <strong>and</strong> monitor space<br />
temp, supply temp return air temp, outside air temp, mixed air<br />
temp, energy wheel contribution temp, relative humidity<br />
(OA/ST/SA/RA), enthalpy, carbon dioxide, et al.<br />
(3) Operating Parameters (pending) – contact GCS Energy<br />
Manager<br />
d) Training Included:<br />
(1) Forty (40) hours in four (4) hour blocks<br />
(a) Hours <strong>and</strong> blocks to be determined by GCS on individual<br />
project basis<br />
(2) Unlimited Attendance<br />
(3) Owner may choose to videotape training.<br />
2. Non-BAS Controls Used<br />
a) Thermostats<br />
(1) Programmable – BACNET or LON programmable features<br />
(2) Battery Back up<br />
(3) Place on return air grill wall<br />
(4) For st<strong>and</strong>alone T’Stats, want physical stops<br />
*=Preferred Br<strong>and</strong>; Bid Alternate Required Page 25 of 38 Pages