26.10.2012 Views

3 - Wacker Neuson Group

3 - Wacker Neuson Group

3 - Wacker Neuson Group

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3 PT SERIES PUMPS PT / PG / PD REPAIR<br />

3.7 Adjusting Valve Clearance<br />

PT2Y / PT3Y<br />

Adjust valve clearance after first 20 hours of operation,<br />

and every 6 months or 500 hours thereafter.<br />

Set valve clearance with engine cold and piston at the top<br />

of its compression stroke.<br />

Valve Clearance Intake: 0.006" (0.15 mm)<br />

Exhaust: 0.006" (0.15 mm)<br />

3.8 Adjusting Engine Speed<br />

PT2Y / PT3Y<br />

Before making any engine adjustments, remove pump<br />

cover and check that impeller and pump housing are<br />

clean, and that impeller clearance is correct. Adjust<br />

engine to a no-load speed of:<br />

3400 ± 100 RPM. PT2Y<br />

3800 ± 100 RPM. PT3Y<br />

To adjust engine speed:<br />

1. Fill pump housing with water. This will keep pump<br />

seals cool while running engine.<br />

2. Start engine and allow it to warm up for a minute.<br />

3. Loosen locknut (b) on throttle stop screw (c). Turn<br />

screw in to decrease speed, out to increase speed.<br />

Make sure throttle lever (a) is touching stop screw<br />

before measuring RPM. Tighten locknut after correct<br />

engine speed is set.<br />

CAUTION: Running pump at a speed higher than that<br />

listed in “Technical Data” can damage pump and engine.<br />

DO NOT adjust governor setting.<br />

3-12<br />

0.006 in.<br />

(0.15 mm)<br />

a<br />

b<br />

c<br />

1003SD47<br />

1003SD48

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!