26.10.2012 Views

3 - Wacker Neuson Group

3 - Wacker Neuson Group

3 - Wacker Neuson Group

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PT / PG / PD REPAIR PG SERIES PUMPS 4<br />

4.2 Periodic Maintenance Schedule<br />

The chart below lists basic pump and engine maintenance. Refer to engine manufacturer’s Operation Manual for<br />

additional information on engine maintenance. A copy of the engine Operation Manual was supplied with the machine<br />

when it was shipped.<br />

D AILY<br />

( Before<br />

Starting)<br />

Check<br />

fluid<br />

Check<br />

engin<br />

level.<br />

e oil<br />

level.<br />

Inspect<br />

for<br />

leaks<br />

between<br />

pump<br />

and<br />

Inspect<br />

air<br />

cleaner.<br />

Clean<br />

as<br />

needed.<br />

Check<br />

and<br />

tighten<br />

external<br />

hardware.<br />

engine.<br />

N EW<br />

ENGINE<br />

BREAK-IN<br />

( First<br />

20<br />

hrs.<br />

)<br />

Change<br />

engin<br />

e oil<br />

and<br />

replace<br />

filter.<br />

E VERY<br />

2 WEEKS<br />

( 50<br />

hrs.<br />

)<br />

Cle<br />

an<br />

air<br />

cleaner.<br />

E VERY<br />

MONTH<br />

( 100<br />

hrs.<br />

)<br />

Check<br />

and<br />

Cle<br />

an<br />

Change<br />

Cle<br />

an<br />

cle<br />

an<br />

spark<br />

sediment<br />

cup.<br />

engin<br />

e oil<br />

and<br />

cooling<br />

system.<br />

plug.<br />

replace<br />

filter.<br />

E VERY<br />

3 MONTHS<br />

( 300<br />

hrs.<br />

)<br />

Check<br />

and<br />

Check<br />

and<br />

adjust<br />

adjust<br />

valve<br />

clearances.<br />

impeller<br />

clearance.<br />

PG2APG3A 4-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!