26.10.2012 Views

3 - Wacker Neuson Group

3 - Wacker Neuson Group

3 - Wacker Neuson Group

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PT / PG / PD REPAIR PT SERIES PUMPS 3<br />

3.19 Frame Assembly (cont.)<br />

Recommended tools:<br />

Socket wrench - 1/2" (13mm), 11/16" (17mm), 3/4" (19mm)<br />

Allen wrench - 6mm<br />

Removal:<br />

1. Remove hardware (1) mounting console (2) to<br />

shockmounts (3). Remove from frame.<br />

Note: Mounting hardware varies on all PT Series Pumps.<br />

2. Remove four screws (4), washers (5), and four locknuts<br />

(6) mounting engine side (7) to console.<br />

3. Remove two screws (8) and washers (9) mounting<br />

pump side (10) to console.<br />

Installation:<br />

1. Mount pump side (10) to console (2) using screws (8)<br />

and washers (9). Apply Loctite 243 or an equivalent<br />

medium strength threadlocker and torque to 28 ft.lbs<br />

(38 Nm).<br />

2. Mount engine side (7) to console (2) using screws<br />

(4), washers (5), and locknuts (6). Torque to 29 ft.lbs<br />

(40 Nm).<br />

3. Mount console (2) to shockmounts (3) using hardware<br />

(1).<br />

Note: See sealant and torque reference charts in back<br />

of book for appropriate threadlocking adhesives and<br />

torque values.<br />

WARNING<br />

Before you start the machine, ensure that all tools<br />

have been removed from the machine and that<br />

replacement parts and adjusters are firmly tightened.<br />

3-25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!