28.12.2013 Views

ENTER.HUB_Baseline study PDF, 6 Mo - Urbact

ENTER.HUB_Baseline study PDF, 6 Mo - Urbact

ENTER.HUB_Baseline study PDF, 6 Mo - Urbact

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EUROPEAN<br />

UNION<br />

European Regional<br />

Development Fund<br />

it is currently working on practice solutions to develop the station district, in the frame of a shared and<br />

sustainable project, including urban, social, economic and environmental issues – which is perfectly in line with<br />

<strong>ENTER</strong>.<strong>HUB</strong> concern. Creil Agglomeration is a typical case of a dense station district that must cope with<br />

limited land resources which may interest some of our partners. It will be able to share its thoughts and<br />

solutions that will be sustained by local experts and by the team of architects working on our project,<br />

throughout the life of the network.<br />

4 - City of Ulm, GERMANY – competitiveness<br />

LOCAL SITUATION REGARDING THE TOPIC<br />

The station is in the developing phase along with the fast track railway Stuttgart – Ulm, under construction. It<br />

is part of the "Magistrale" Paris-Budapest and will be completed in 2018.<br />

The planning process for the area around the station and the station itself has already been started with an<br />

ideas competition in 2011. Before 2011 there was already an information campaign of the city: a special part of<br />

the planning process is the participation of the citizens in the whole planning process. There were some public<br />

presentations and "Forum" workshops with the citizens. Since 2008 an information pavilion at the square in<br />

front of the railway station area was installed. A website for the planning process was established in 2011.<br />

www.citybahnhof.ulm.de<br />

The results of the ideas competition was discussed in the city council and there will be a competition for the<br />

implementation will follow 2012.<br />

An urban and territorial replanning of the railway station and the area surrounding is in planning: the decision<br />

to have the fast track railway to Ulm has massive consequences on the planning. It brings Ulm nearer to the<br />

capital of Baden-Würtemberg and nearer to the next airport. There will be a new and high demand on housing<br />

and it will make Ulm a center for services, much more than it is now. Part of this demand has to be developed<br />

on the area of the station.<br />

In 2012 there will be multiple realisation competition for several aspects of the planning. The main emphasize<br />

will be on the station building and on the passages towards the inner city and to the west.<br />

MAIN EXPECTATIONS VIS-A-VIS THE NETWORK<br />

From the network we expect the possibility to learn from other cities which are more advanced in the planning<br />

and building of a new station and of the surrounding of a station. We are interested in the various planning<br />

rights situation in Europe and how we can do this planning quicker and better through the comparison with<br />

other European cities that have a high speed train station. We are also interested in the change that these<br />

planning processes bring to the service character of a city.<br />

ISSUE / PROBLEM THE PARTNER WANTS TO ADDRESS THROUGH THE LOCAL ACTION PLAN<br />

The URBACT program will be used to bring European ideas from other cities with similar problems, similiar<br />

challenges and also from those partners that have more developed plans than in Ulm .Some stations in Europe<br />

are already in construction and we hope to share the experience with those that are ahead. Fresh ideas<br />

concerning the participation of citizens are also most welcome for us in Ulm.<br />

Main points for the LAP:<br />

- The changing needs of mobility and the increasing dimension of mobility will change the image of the city in<br />

an very special way. The focus of this development will be around the important hubs.<br />

- The project “City - Station” Ulm has the aim to develop the whole area on both sides of the station into an<br />

urban quarter. This means that the areas which lie around the station will be developed into new quarters for<br />

living/housing and working.<br />

- Seen in the context of the city as a whole, these changes will be as important as the great historic<br />

development steps of the city. These changes will position Ulm as an important partner in the European<br />

context of the main railroad Paris-Budapest.<br />

Given these main points of investigation, Ulm in its LAP will specifically focus on theme 3.b. improvement of<br />

the hub image – improvement of the city/region image.<br />

HOW THE PARTNER CAN BENEFIT FROM THE NETWORK AND WHAT THEY CAN BRING TO THE NETWORK<br />

Ulm can bring the experience of an extensive planning process in our City, over many years, which gave us the<br />

experience of a planning in difficult and vulnerable areas and central hubs of the city and also the experience<br />

<strong>ENTER</strong>.<strong>HUB</strong> <strong>Baseline</strong> <strong>study</strong> 2012.10.31<br />

37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!